Pressure Filling Combined Beer Keg Filling and Washing Machine

Min.Order: 1
Product origin: Qingdao, Shandong, China
Infringement complaint: complaintComplaint
US$ 6600 ~ 8600

Description
 

Beer Keg Washing and Filling AIO Machine(table board lifting)



Main Technical Parameters
Equipment Outer Dimensions1200*1600*2000mm
Net Weight380KG
Power Steam Heating: 3KW  Electric Heating: 18KW
Production Capacity30-40 kegs/H
Applicable KegsKeg with Diameter 250-500mm,  Height 360-600mm
 Tank Heating WaySteam Heating or electric heating
Table Boardlifting
Power Supply VoltageAC 380V  50HZ (customized)

Main function and feature

1,Automatic control by PLC, all parameters can be adjusted through touch screen.
2,Cleaning and filling process can be finished in this machine at one time.
3,With unique pressure maintaining system,performance stable and reliable, beer loss minimum.
4,With CIP automatic cleaning system
5.Table board is lifting, and convenient to take kegs, labor-saving and time-saving.

Working process

Washing process (with 2 tanks ,steam heating)
cylinder pressing→ air blowing (draining residue) → water wash (drain)→ air blowing (drain) → caustic wash → air blowing (caustic recycle) → hot water wash→ air blowing (drain) →hot water wash (drain)→ air blowing (drain) →steam sterilization (drain)→COreplace steam (drain)→ water wash ( hot water recycle)→ Co2 blowing (hot water recycle)→CO2 pressurize

Filling process
Cylinder pressing →steam blow keg spear (drain)→drain→Co2 pressurize (evacuate)→fill (evacuate)→ hot water wash keg spear (drain) →Co2 blow (drain) →drain
washing station (with 3 tanks ,steam heating)
cylinder pressing→ air blowing (draining residue) → water wash→ air blowing (drain) → caustic wash → air blowing (caustic recycle) → hot water wash→ air blowing (drain) →water wash→ air blowing (drain) →sanitizer→ air blowing (recycle) →water wash→ air blowing (recycle)→steam sterilization→ water wash→ air blowing (recycle)→CO2  replace steam→CO2 pressurize
filling station:
Cylinder pressing →steam blow keg spear (drain)→drain→Co2 pressurize (evacuate)→fill (evacuate)→ hot water wash keg spear (drain) →Co2 blow (drain) →drain
Process of CIP
Connect the CIP liquid to the beer inlet→ connect the CIP outlet to the drainage or CIP recycling pipe→ install the blind flange to the filling station→ click "CIP" on touch screen →press "start" on the filling station →press "stop" when finish the CIP.
Note: After CIP process, please connect co2 to the beer inlet to blow out some residual CIP liquid inside of the beer pipe.



Product Tag:
Related categories:
Scroll to Top