in The 30 Meter Central Square Octagonal High Pole Light

Min.Order: 10
Product origin: Yangzhou, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 220 ~ 256

Description

Product Description

Model Number
br-(40W)
br-(30W)
br-(25W)
br-(20W)
solar Panel
60W
60W
50W
50W
Battery Type
12v(Lithium battery)
12v(Lithium battery)
12v(Lithium battery)
12v(Lithium battery)
 
Lumen(LM)
4000-4400lm
3000-3300lm
2500-2750lm
2000-2200lm
Colour Temperture
6000-6500k
6000-6500k
6000-6500k
6000-6500k
Discharge Time
10-12hours 3-7rainy days
Working Temperture
-20ºC~+60ºC
-20ºC~+60ºC
-20ºC~+60ºC
-20ºC~+60ºC
Waterproof Rate
IP65
IP65
IP65
IP65
Mounting Height
6-7m
6-7m
5-6m
5-6m
Packing Size
1190*390*220mm
1190*390*220mm
1190*390*220mm
1190*390*220mm
Net Weight
92kg
92kg
87kg
87kg
Gross Weight
94kg
94kg
89kg
89kg

Product Parameters

 

Installation effect


Factory workshop details show

Company Profile

Packaging & Shipping

 


FAQ

1.Question : Are you a factory or trading company ? 
Answer: We are an SGS recognized OEM / ODM manufacturer factory with export license. We have an outstanding and experienced team made up of "A" player who have a passion for doing something great to create more value for customers world-wide.
 

2. Question :  Why choose cooperate with us ? 
Answer :     -- Right people, Right product, Right price ;
                   -- Company-wide customer awareness ;
                   -- Reliable Quality and All components from world leading suppliers ;
                   -- Cost-effective export infrastructure and total supply chain management ;
 

3. Question : How does your factory do regarding quality control ? 
Answer : Assuring Quality is our dignity and quality control engineers specially be responsible for quality checking in each process such as Incoming Quality Control , In Process Quality Control , Outgoing Quality Control , Environment Control, Product Traceability System , Internal Audits & Calibration, Equipment Control & Maintenance , Control of Non-Conforming Materials and etc.
 

4. Question : What is the average delivery time ? 
Answer : Most of the time, it would be around 1 week since after confirm receiving customers' contract money. For mass production purchase order at big quantity, the delivery time could be discussed with each other case by case. 

Product Tag:
Related categories:
Scroll to Top