Good Price Quality 1 Roll Manufacturer HP 1260 Ceramic Fiber 3600X610X50mm 128kg/M3 Ceramic Wool Insulation Blanket

Min.Order: 100
Product origin: Zhuhai, Guangdong, China
Infringement complaint: complaintComplaint
US$ 3.92 ~ 7.84

Description
Packaging & delivery
Packaging Details :s
tandard export package of Fireproof Material Ceramic Fiber Wool Products
Port:Tianjin Xingang port ;zhuhai gaolan port
Lead time:
Quantity(pieces)1 - 1000>1000
Lead time (days)7To be negotiated

CERAMIC WOOL BLANKET
Huali Fireproof Material Ceramic Fiber Wool Products for Fireplace Thermal Insulation

Ceramic wool is made from aluminum silicate stone, burn above 2000ºC electric stove melt, spray to blow fiber. It is widely uesed for pipe and equipments of pyroelectricity, petroleum-chemical, boats, building, machines, boilers,etc. with the performance of fire prevention, heat insulation, sound absorption,and other so many technical features.

 



HUALI PROFILE
Huali is established in 1995 , with registered capital of 100 million RMB, 8 branches, more than 500 employee. We are not only a insulation manufacturer but also engineering company for installation service, insulation solutions as EPC insulation contractor. Since 2013, Huali developed into the LNG market and successfully finish several international projects of Ichthys, Yamal, KIPIC, and now is specilized in GCGV modules built, future Canada LNG and Arctic 2 etc. If you want to know more inforamtion about us or cooperate with Huali, contact us directly.

FAQ
____________________________________________________________________
Q: Are you a manufacturer or a trading company ?
A: We are a manufacturer founded in 1995,  with 8 branches

Q: Can you accept neutral packing & OEM ?
A: Normally, our packing is carton with Huali logo , but we can accept the neutral packing and OEM. However, custom should pay the OEM packing charge.

Q: Can you provide the sample for free ?
A: We provide some samples for free, but the express charge should be bore by customer.



Q: What's the lead time?
A: 7-15 days after receipt of advanced payment


Q: What's the payment term?
A: 50% advanced payment and 50% paid prior to load by TT. and large amount can be paid by LC.


Q: How to contact you? 
 
 
Product Tag:
Related categories:
Scroll to Top