Q195 Q235 Raw Material for Nail Making SAE1006 SAE1008 Steel Wire Rod Price Nail Wire Raw Material High Carbon Rebar Coil

Min.Order: 25
Product origin: Jinan, Shandong, China
Infringement complaint: complaintComplaint
US$ 450 ~ 530

Description
Product Description
 

 

Product NameSteel Rebar/ Wire, Deformed Steel Bar, Ribbed Steel Bar 
MaterialQ235, Q355; ASTM A53 GrA, GrB; STKM11, ST37, ST52, 16Mn
Size4mm, 6mm, 8mm,10mm, 12mm, 13mm, 14mm, 16mm, 20mm, 22mm, 25mm, 30mm, 32mm, 40mm, 50mm
Length5m-12m, 5.8m, 6m,10m-12m,12m or as customer's actual reques
StandardBS4449,GB1449.2,JIS G3112, ASTM A615 A615M
TechniquesTMT(Thermo-Mechanical-Treatment), hot ribbed, prestressed
GradeGrade 40/60/75
BS 4449 460B/500B
GB HRB335 HRB 400 HRB 500
JIS SD390
Section ShapeSpiral Shap, Herringbone Shap, Crescent Shap
Techniquehot rolled ribbed, prestressed
PackingBundle or as your requirements
OriginChina
 
Theoretical Weights into Diameters
Diameter(mm)
Theoretical Weight
(Kg/m)
Diameter(mm)
Theoretical Weight
(Kg/m)
Diameter(mm)
Theoretical Weight
(Kg/m)
Diameter(mm)
Theoretical Weight
(Kg/m)
5.5
0.184
21
2.72
40
9.86
95
55.6
6
0.222
22
2.98
42
10.9
100
61.7
6.5
0.260
23
3.26
45
12.5
105
68
7
0.302
24
3.55
48
14.2
110
74.6
8
0.395
25
3.85
50
15.4
115
81.5
9
0.499
26
4.17
53
17.3
120
88.8
10
0.617
27
4.49
55
18.6
125
96.3
11
0.746
28
4.83
56
19.3
130
104
12
0.888
29
5.18
60
22.2
140
121
13
1.04
30
5.55
63
24.5
150
139
14
1.21
31
5.92
65
26.0
160
158
15
1.39
32
6.31
68
28.5
170
178
16
1.58
33
6.71
70
30.2
180
200
17
1.78
34
7.13
75
34.7
190
223
18
2.00
35
7.55
80
39.5
200
247
19
2.23
36
7.99
85
44.5
220
298
20
2.47
38
8.90
90
49.9
250
385

Application

 



 
Packaging & Shipping

 

Max Loading 27mt for each 20Gp container. Or 40GP/40HC as required.

1. Generally package: Anti-water paper+strapped with minimum 3 strapping strips.

2. Standard exporting package: Anti-water paper and plastic+covered by iron sheet+strapped
with minimum 3 strapping strips

3. Excellent package: Anti-water paper and plastic film+ covered by iron sheet+ strapped with
minimum 3 strapping strips+fixed on the iron or wooden pallets.
Company Profile

 


FAQ

 


Q1: What is your terms of payment?
A: 30% T/T as the upfront deposit, 70% before delivery. We will show you the photos of products and package before you pay the balance.

 

Q2: what is the terms of delivery?
A: EXW, FOB, CIF, CFR, DDU

 

Q3: What is the terms of packing?
A: generally, we pack our goods in bundles or coils with rods or belts. We could also pack the goods as the customers's requirement.

 

Q4: What is your delivery time?
A: For stocks, we could transport goods to load port within 7 days after we received your deposit.
For production period, it usually takes about 15 days-30 days after receiving the deposit.

 

Q5: Could you produce according to the samples?
A: Yes, we could customer-made by your samples or technique drawings. We could build the mold and fixtures.

 

Q6: Could you provide the compliment samples?
A: yes, we could provide samples on conditions it is available in stocks, however, the transportation fee is borne by buyer.

 

Q7: How could you guarantee your products?
A: Each piece of products is manufactured by certified workshops, inspected by ZUNKAI piece by piece according to national QA/QC standard. We also could issue the warranty to the customer to guarantee the quality.

 

Q8: How do we trust your company?
A: We specialise in the steel business for 14 years, headquarter locates in Jinan, Shandong province, you are welcome to investigate any ways, by all means, you could place an order in alibaba with trade assurance which could secure your payment.

Product Tag:
Related categories:
Scroll to Top