Customize Pre Fabricated Steel Structure Mobile Hotel with Customized Roof Material / Color

Min.Order: 20
Product origin: Hengshui, Hebei, China
Infringement complaint: complaintComplaint
US$ 30 ~ 45

Description
 
Steel Structure House

   The following prefab house use light gauge steel as house structure, has many windows to increase the light in the room.The exterior wall and roof material / color can be customized according to your need.
3 Bedroom 2 Bathroom 1 Living room 1 Kitchen 1 Dining room .

 

Advantages:
1. Lower cost with better quality
2. Fast construction saves time and labor costs.
3. Easy to install and maintain 
4. High quake-proof, water-proof and fire-proof
5. Prefabricated and customized designs
6. High space efficiency
7. Life time: Over 25 to 50 years
8.Environment friendly
9.Nice appearance

 

 

After-sale Services we provide
1. Offer guide installation service.
2. One-stop shop steel structure house service
3. Free design service.
4. Expert oversea installation team service. 


Please kindly tell us information as below if you are interested in our products ,then we design it for you.
1. Usage: House, Hotel, Office, Shop, Villa.
2. location: In which country will be built?
3. Dimension: Length*width*height
4. Local climate: Wind speed,Snow load (max. Wind speed)
Company Profile

  The company continuously attracts the elite of steel structure talents, and now has 12 professional engineering and design personnel.Over the years of development, Ruiteng Steel Structure Co., Ltd. has developed a diverse and flexible design team that can independently complete steel structure optimization design, mature and refined an elite team with detailed node drawings and complete and standardized construction and installation procedures.

 
Certifications

FAQ

Q: Are you trading company or manufacturer ?
A: We have our own steel structure, steel sheet and sandwich panel manufacturing factories. Welcome to our company to see our products and discuss your project.
Q: Can you provide on-site installation service?
A: We can provide Installation guide service based on customers' request. The shop drawing, installation drawing and video will send to client to help the site erection. If need, our engineer will come to site to guide the installation.
Q. What is the delivery time?
A: It depends on the quantities of order. Generally, the delivery time will be within 25 to 60 days.

Q. How can I get a quotation for my project?

A: Pls no hesitate to send me message here or Email me. I will reply to you ASAP. Welcome to contact me for your building!
 
Product Tag:
Related categories:
Scroll to Top