High Precision Aluminum Die Casting Watch Case with Sand Blast Anodize

Min.Order: 100
Product origin: Qingdao, Shandong, China
Infringement complaint: complaintComplaint
US$ 1.5 ~ 2.6

Description
High Precision Aluminum Die Casting Watch Case with Sand Blast Anodize
MaterialAluminum alloy ADC12, ADC10, A360, A380, A356
Magnesium alloy AZ91D, AM60B
Zinc alloy ZA3#,ZA5#,ZA8#
Processing CraftDrawings→ mould making → die casting →rough machining → CNC machining →surface treatment →product checking→ packing →delivery
Tolerance± 0.02mm
Surface TreatmentElectroplating, Chrome Plating, Zinc Plating, Nickel plating, Electrophoresis, Anodization, Polishing, Powder coating, Sandblasting, Passivation, Spray painting, Etc.
Quality AssuranceISO9001:2015 Certified, SGS Certification
Inspection1.Foundry in-house: 100% inspection on critical dimension; 100% on appea rance.
2.Third Party inspection available upon requirement.
Mainly Testing FacilityThree-dimensional measuring instrument, Salt spray test box, Dynamic balance detector, Pneumatic detection
Quality GuaranteeTwo years
Features & Advantage1.High machining accuracy, the flatness within 0.1mm.
2.High finish appearance, smooth surface roughness is Ra1.6 after machining.
3.The machining precision is high and the assembly structure is seamless.
4.Smooth appearance, corrosion resistance.
5.Pass Salt Spray Test with 96 Hours.
Standard1.Aluminum alloy : ISO3522-84, ASTMB85-96, ASTMB597-98
2.Magnesium alloy : ISO/DIS16220-1999, ASTMB93/B93M-98,JISH2222-1991
3.Zinc alloy: ISO301-1981, ASTMB86-98, ASTMB240-98, ASTMB327-98
FAQ
Q1.How to have my components quoted ?
A1: Please contact us via TradeManager or Email and send us your drawings inclusive of 2D and 3D (.STEP or .IGE file) and detail requirements. We are pleased to sign NDA with you if you prefer. Then our engineering team will work on them and submit competitive quotation to you.

Q2.What is the lead time for tooling and samples fabrication?
A2: The exact lead time depends on your parts specification.
The normal lead time is 40*45 days for tooling fabrication and samples.
If the tooling is not required, the lead time for samples is 15 days normally.

Q3.Can I have prototypes for testing before tooling ?
A3: Yes, our factory have team to support prototypes with machining process to fabricate them for your testing.

Q4.How to ship the samples and production order ?
A4: We will normally ship samples via DHL, UPS or FedEX via our cooperated forwarder or freight collect. For the shipping of production order, it will be by sea or by air

Q5.How to ensure the quality of parts?
A5: Firstly, our team will inspect all incoming material. QC team will inspect parts while production and finished products, then submit Quality Inspection Report together with samples and production order.
Scroll to Top