Stainless Steel Multi-Layer Paddle Type High-Efficiency Electric Heating Planetary Mixer

Min.Order: 1
Product origin: Foshan, Guangdong, China
Infringement complaint: complaintComplaint
US$ 3000 ~ 5900

Description
 

Detailed Photos
Product Description

1)Pulp part
The solvent through the liquid metering device is added to the liquid material groove , by Vacuum suction to emulsifying kettle , start low speed anchor mixer , the powder material is
 sucked into the vacuum emulsifying tank for continuous stirred 10 minutes , then turn on the two sets of vertical high shear emulsifying 10 minutes , finally use horizontal emulsion machine , continuous cycle 30 minutes , finished slurry . A high shear inside the tank and an emulsion pump outside the tank are also used ,Ensure further refinement of materials , and greatly shorten the operation time 

2)Paint part
By vacuum , resin , film-forming agent from the liquid tank into the low-speed stirred tank  the bag filter is sucked into the low-speed mixer , the emulsion or solvent ,additives , slurry mixing , then adding additives ( thickener ) , blending paint .
3 ) Filter packing
After a good tune paint , vacuum defoaming after 5 minutes , stirring was stopped by a bag coating to semi-automatic filling machine for packaging , When the coating material using a two bag filters , can be switched with each use , does not affect the filling speed

 

Production process

1)Base material dispersing mixer/Vacuum kneader,
2)High viscosity pump 
3)Base storage tank,
4)heating system(according to actual requirements)
5)Vacuum system,
6)Three roller grinding machine(according to actual requirements)
7)multifunctional-dispersing machine
8)Hydraulic discharging machine,
9)Cooling system,
10)Sealant filling machine( plastic bottle filling machine,film filling machine)
11)Raw material storage tank
12)Oven,
13)Batching system,

 

  modelfeeding volumaplanetary motorhigh-speed motorRevolution speedRotation speedHigh speed dispersion speed
DLH-6L3.61.51.527430~1000
DLH-20L123327430~1000
DLH-60L364427430~1000
DLH-100L607.55.527430~1000
DLH-200L120151127430~1000
DLH-350L21018.518.527430~1000
DLH-600L360222227430~1000
DLH-1000L600373023430~1000
DLH-1500L900454523430~1000
DLH-2000L
 
1200
55452343

0~1000
 
 

 

 

about us

 

Certifications

 

 

FAQ

Q : Can you send the formula for the products we want to make ?
A : Our machines can be used for many kinds of product making ,such as Resin , Paint, Adhesive , Cosmetic , Food , Chemicals . There are many kinds of these products , so it's impossible for us to know all the formulas and technologies . We can assist you to find the raw material list you need , and after you place order with us , we can help you to find formula and technology , there will engineers to teach you how to make the product , and the cost will be on your account.  
Q : Do you have machines in stock ?
A : Yes , but just the small-scale machines Machines are different with other products , most of the large-scale machines are designed according to our customers 'requirements different customers have different production requirements , so the technical parameter is different for most machines On the other hands , most of the our machines will cover a large area , so once the machines are finished , we will effect shipment after QC . 
Q : Can you send the detailed drawings of the machine to us before we place order ?
A : We can send you a draft drawing of the machines , and after you place order and pay the deposit , our engineer will design the send you the detailed drawings . Once you confirm without questions , we will put it into production.
Q : Why does it take at least 20 days to finish the machine ?
A : Once receipt the deposit from you , we will design the drawings and make out the list of the materials and accessories for the production . Once the drawings are finished , our workers will start the production , from welding , polishing , assembling debugging , detection and so on . After finish , they need time to check the machines , if found any possible defect parts , they will return to the production until every part is 100% approved.
Q : Can we pay the balance after we receive the machines and test without problem.
A : It's unnessary to worry about the quality of our machines , we are confident in that . After the machine is finished . we can install and test the machine for you ( if you can not come to our factory ,we can record a video and send to you ) . Only after you check without problems , we will effect shipment .

 

 
Product Tag:
Related categories:
Scroll to Top