Description
Product Parameters
PH | 6--8 | B\C | ≥0.3 |
Inflow suspended solids | ≤1500mg\L | Influent ammonia nitrogen concentration | ≤2000mg/L |
Effective water depth | 5-8m | COD concentration of influent water | ≥1500mg/L |
Effective water depth | <0.8m/h | UASB sludge yield | 0.05-0.10kgVSS/kgCOD |
Total depth of sedimentation zone | ≥1.0m | Sedimentation zone surface load | ≤0.8m |
The distance between the perforated water pipe and the pool bottom | 200mm | Outlet weir load | 6.12m/(h·m) |
Use for | Mineral, Printing, Chemical, Dyeing, Starch | Certificate | SGS, ISO |
Product Description
The biodegradation of the IC reactor is divided into two stages. The first reaction zone at the bottom is at high load, and the second reaction zone at the top is at low load. The influent enters the first reaction zone from the bottom and is fully mixed with anaerobic activated sludge. Most of the organic matter is degraded into biogas in this zone, and the generated biogas is collected by the gas collection hood of the three-phase separator and rises along the biogas riser, At the same time as it rises, it also lifts the mixed liquid in the first reaction zone to the gas-liquid separator at the top.
The biogas is discharged from the top, and the separated mud water mixture returns to the bottom of the first reaction zone along the mud water return pipe. It is fully mixed with the granular sludge and influent at the bottom, achieving internal circulation of the sludge. The result of internal circulation not only makes the first reaction zone have a high microbial biomass, a long sludge age, and a high upflow rate, It is generally 10-20m/h, allowing the granular sludge to fully reach a fluidized state, greatly improving the organic matter degradation rateDetailed Photos
The reaction process in the second reaction zone is basically the same as that in the first reaction zone, except that the flow rate is greatly reduced, usually 2-10m/h
The main components of the UASB reactor include: inlet water distribution system, reaction zone, three-phase separator, outlet system, gas chamber, scum collection system, and sludge discharge system.
Advantages:
1. Double layer reaction bed, high volumetric load, high sludge concentration in the reactor, large microbial biomass, and internal circulation, good mass transfer effect, and influent load up to three times that of a regular reactor;
2. The reactor has a large aspect ratio (usually 4-8) and a small footprint;
3. Strong anti impact load capacity, a large amount of circulating water and influent water are fully mixed to fully dilute the harmful substances and concentration in the raw water, reducing the impact of harmful substances on anaerobic reactions;
4. Internal automatic circulation, without the need for external pump circulation, reduces energy consumption;
5. Short start-up cycle, high sludge activity in the reactor, and fast biological proliferation
Certifications
Our project
Applicable scope:
Suitable for high concentration organic wastewater, such as alcohol, molasses, citric acid and other wastewater;
Medium concentration wastewater, such as wastewater from beer, slaughtering, soft drinks, etc
Low concentration wastewater, such as domestic wastewater
COMPANY PROFILE
Shandong Wanze Shengshi Environmental Protection Technology Co., Ltd. is located in the beautiful kite capital of Weifang. It is an environmental protection technology company specializing in environmental engineering and equipment research and development, production, sales, installation, debugging, after-sales service, and providing customers with overall sewage treatment solutions. With a market-oriented approach and high-tech research and development as the leader, the company has successively launched multiple industry-leading technologies in China. Greatly improving the service life of the equipment, reducing operating costs, and expanding the application of the equipment in difficult engineering fields. Our company's products have been widely applied in industries such as sewage treatment plants, hospital wastewater, aquaculture wastewater, industrial circulating cooling water, reclaimed water reuse, harmless treatment of chemical wastewater, food processing, etc., covering anaerobic fermentation biogas engineering for livestock manure, resource treatment engineering for kitchen waste, sewage treatment engineering, biogas desulfurization and purification engineering, organic fertilizer engineering, odor gas treatment engineering, etc. Due to its reasonable design, stable and reliable operation, high degree of automation, and good after-sales service, the product has won widespread praise from users in various industries.
Packaging & Shipping
FAQ
1.Q: Where is your company? How can I visit there?
A:The company is located in Zhongcheng International, Kuiwen District, Weifang City, Shandong Province, China. It is about an hour's drive from Qingdao Airport and Weifang Railway Station. If you need it, we can come and pick you up. Welcome to visit our company. 2.Q:Do you have minimum order quantity request?
A:No minimum order, but it can get a discount if you order a large quantity.
3.Q:Do you have certificates?
A:Yes,we have ISO,SGS certificate.4.Q:Can you meet my special requirements for the product?
A:Yes,we have a professional design team.We can provide drawings according to your requirements.5.Q:How to buy your idea products?
A:You can provide us your water or waste sources,water or waste quality,flow rate and ground area (connect us for more details) .6.Q:How to pay?
A:T/T and L/C are acceptable and T/T will be more appreciated 30% deposit before producing,70% balance before loading by T/T.7.Q:What is the delivery time ?
A: It depends on order quantities .Generally speaking ,the delivery time will be within 2 to 4 weeks.8.Q:How to pack the products?
A:We use standard package .If you have special package requirements ,we will pack as required ,but the fees will be paid by customers.9.Q:How do you manufacture your equipment?
A:Our machining technology includes laser 1 plasma cutting ,automatic welding, CNC cutting and bending.10.Q:How to install after the equipment arriving destination?
A:We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee ,air tickets ,accommodation, wages will be paid by buyers.