The corrugated cardboard production line is critical production equipment for corrugated box manufacturers and plays and essential role in making corrugated boxes with the total layer number being three, five or seven. By contrast, foreign customers usually called three layer, five layer or seven layer corrugated boxes in accordance with the number of the fluted sheet.
The corrugated production line is mainly composed of mill roll stand, single-roller pre-heater, single facer, overbridge conveyor, multi-roller pre-heater, glue machine, double facer, slitting machine, NC cut off, stacking machine and glue kitchen as well as auto splicer, coating machine, production & management system, condensate water recycling system and waste baler as optional.
1, Stacker | 2, Cut Off | 3, Slitting Machine |
4, Double Facer | 5, Pasting Machine | 6, Dual-roller preheader |
7, Mill Roll Stand | 8, Overbridge | 9, Preheater |
1, Stacker | 2, Cut Off | 3, Slitting Machine | 4, Double Facer | 5, Pasting Machine |
6, Dual-roller preheader | 7, Mill Roll Stand | 8, Splicer | 9, Single Facer | 10, Preheater |
1, Dual-layer Stacker | 2, Dual-layer Cut Off | 3, Slitting Machine |
4, Cutting Machine | 5, Double Facer | 6, Pasting Machine |
7, Dual-roller preheader | 8, Splicer | 9, Mill Roll Stand |
10, Preheater | 11, Single Facer | 12, Overbridge |
Layer 3, 5, 7, 3+2, 5+2, 7+2 |
Work Width (mm) 1200 - 2800 |
Design Speed (m/min) 80, 100, 150, 200, 220, 250, 300 |
Flute A, C, BC, B, E, F, G, N |
Flute(UV) | Flute Height(mm) | Flute Qty./ 300mm |
A | 4.6-4.9 | 34 ± 2 |
C | 3.6-3.9 | 38 ± 2 or 40 ± 2 |
BC | 3.0-3.4 | 44 ± 2 |
B | 2.6-2.9 | 50 ± 2 |
E | 1.1-1.5 | 92 ± 2 |
1.5-1.8 | 88 ± 2 | |
F | 0.7-0.9 | 124 ± 4 |
G | 0.5-0.65 | 166 ± 6 |
N | 0.4-0.46 | 188 ± 10 |
1. Are you manufacturer or trading company?
We a combination of manufacturer and trading company.
2. What is the payment term you accept?
We usually accept T/T. DP and LC are also ok for us.
We need 30% payment as deposit to arrange production and the balance should be paid before shipping.
3. What is your leading time in average? How much time needs for installation?
The manufacturing period is 120 days since deposit is received and installation period is around 30 days.
4. How do we install and debug machine?
Engineer guides installation and debug machine via video or on site.
5. Where is factory? How can we visit there?
Factory is at Mianfang Road 36, Dongguang County, Cangzhou City, Hebei Province, China.
It is near to Beijing and Tianjin, so after you get Beijing or Tianjin airport, we will pick you up to factory.