Event Festival Wristbands/Woven Polyester Bracelets with Smart Card for Access Control

Min.Order: 1,000
Product origin: Jinan, Shandong, China
Infringement complaint: complaintComplaint
US$ 0.18 ~ 0.25

Description

Size:

248*16*1.5mm, 231.5*20mm or Customized

Craft:

Color printing, Engraving, Glue

Material:

Fabric, PVC
Protocol:ISO7815/ISO14443A/ISO15693, ISO18000-6C/ISO18000-6B/ISO18000-6C
Frequency:125Hkz, 13.56Mhz, 915Mhz Optional
125kz Chip Available:

EM4100, EM4205, EM4305, EM4450, TK4100, T5577, Hitag 1,Hitag 2, HTS256,

HTS2048, Hitag UR064 or other customized chips

13.56Mhz Chip Available:

Mifare 1K S50/ Mifare 4K S70/ Mifare Ultralight

 

Tag-it HF-1 Plus(TI 2048, TI 2K)

Mifare 1K-Compatible: FM11RF08(F8)/Huada S50

Mifare 4K-Compatible: FM11RF32/Huada S70

FM08, TK S50

MAURAT

Or other customized chips

860-960Mhz chip available:Ucode G2, G2 XL, G2 XM, Higgs-3 or other customized chips
Working environment:Store temperature: -25 °C ~50 °C;
Humidity 20% ~ 90%RH;
Working temperature: -50°C~ 210°C.
Working life:5-10 years
Aplication:

Identification of anti-counterfeiting;

Access Card/Bus card/Subway card/membership card;

Payment;

Advertising; 

hotel management


RFID Label Disposable Smart Fabric Bracelet Woven PVC Cards NFC Wristband


Application

FAQ

Question 1: How to place an order?
A: The procedure is like this:
1). Contact customer service to determine the specification and product model, quantity and other detailed information (you can also arrange freight forwarding by yourself);
2). We provide you with a proforma invoice according to your final decision, which contains all product details;
3). You need to arrange 50% of the payment to our bank account, and then we will prepare the product to start production (the cycle is generally about 10 days, which can be shipped specifically for your order configuration quantity);
4). After the product is completed, the remaining payment is paid, and we arrange forwarder delivery (or we provide relevant information to arrange forwarder transportation by ourselves).
5). After completing this process, the customer service will track the product location and notify you when it is about to arrive and when it arrives, so that you can quickly prepare for customs clearance and other related issues.
6). After getting the items, there will be a dedicated after-sales team waiting for your follow-up feedback.

Q2. What is your production/delivery time?
A: The production/delivery time will be controlled within 20 days (generally, it can be shipped in 10 days and simple configuration is 2-3 days).

Q3. Do you test all items before shipping?
A: Yes, we have passed 100% testing before shipment (basic equipment testing also includes roads, climbing, raining, over-water roads, etc.).
 
Q4. Do you support sample shipment?
A: Yes, we support shipping samples to the port


Why choose us?
1. Complete certificate
2. Perform 100% QC inspection before leaving the factory
3.100% tracking the progress of product orders and feedback
4. Real-time tracking of customers to ensure that orders are produced in strict accordance with customer plans
5. Complete development and supply chain to provide follow-up quality assurance.

Scroll to Top