Kraft Paper Cooling Pads Production Line

Min.Order: 1
Product origin: Weifang, Shandong, China
Infringement complaint: complaintComplaint
US$ 53000 ~ 67000

Description

Kraft Paper Cooling Pads Production Line


Product Description

Line of production:

 
1. pouring glue and drying kraft paper. Use red resin, per cbm need 8kgs.
 
2. cutting the paper into 740 mm or 1100 mm width.
 
3. making the pre-painted paper into corrugated shape. Paper width would be 700 or 1060 mm.
 
4. putting the corrugated paper together with white glue (per cbm need 10kgs white glue).
 
5. heating and drying the corrugated paper.
 
6. cutting cooling pads into required size (2000x600x150/100mm , 1800x600x150/100mm).
ItemResin Machine (m)Paper Cutting Machine (m)Corrugated Machine (m)Gluing Machine (m)Heating Oven (m)Sawing Machine (m)Electric control system (m)
Volume3.6*3.35*4.151.95*0.4*1.453.05*0.55*1.352.7*0.8*1.759.2*3.8*2.954.3*2.8*2.51.4*0.6*3.75
Power70KW/H0.5KW/H18KW/H1.5KW/H70KW/H2.2KW/H 
 

 

Resin Machine
 
1.High quality stainless steel to ensure never rust under high temperature condition.
 
2.Adopt 8 digital control, easy operation, uniform temperature, higher heating efficiency, lower electricity consumption to improve cooling pad quality.
 
Cutting Machine
 

 

Corrugated Machine
 
Model: 5090/6090/7090
 
Adopt wear resistant bushing which is made of special material, withstand high temperature, longer service life.

 

 

Gluing Machine
 
Widen glue machine to improve working efficiency and reduce intensity
 

 

Heating Oven
 
Inner circulating heating oven to achieve multi-direction heating, quick temperature rising. high efficiency ,lower drying cost.

 

Sawing Machine
 
Use the high quality sawing blade to ensure the cooling pad no burrs on surface

 
Product Application

Related Products
 

                                 Cooling fan                                                                         Cooling pad                                                                  Cooling pad paper                             

FAQ

Q1:Are you factory or trading company?

A1:Factory, welcome to visit us at any time.

Q2 : How long is the delivery time?
A2 : Normally, delivery time is 7-15 days or as customers' requirements.

Q3 : What's your payment term?
A3 : By T/T 30% deposit and balance before shipment or by L/C at sight .

 

 

 

Scroll to Top