Ggd Electrical Cabinet Profile Roll Forming Equipment Automatic Control Cabinet Section Steel Equipment

Min.Order: 1
Product origin: Cangzhou, Hebei, China
Infringement complaint: complaintComplaint
US$ 45000 ~ 50000

Description

                         Electrical cabinet post machine roll forming machine

                              Nine Fold Profile roll forming machineTechnical parameters (Item:YX42.5-42.5)

No.ITEMPARAMETERREMARK
1MATERIALTypeCold-rolled strip steel, galvanized sheet 
T.(mm)1.5mm 
Yield Strength (Mpa)Q235 
2Forming product   Width42.5mm 
3Forming speed   (m/min)2-6mIncluding welding
4Forming main power   (KW)11 KW*2 pcsFYR
5Hydraulic power   (KW)18.5 KWFYR
6Voltage AC380V,50Hz,3P 

Devices completed 16 fold cabinet frame prodution line 

No.Machine nameQTYREMARK
1Uncoiler   straightener1 
2Servo Feeder1 
3Hydraulic   machine/Punch machine1With mould
4Guide device1 
5Forming machine1 
6Roller welding1 
7Follow Shear1Including knife
8Collect rack1 
9Control system1 
10Box bending machine1With mould

Cabinet frame machine accessories brand

No.Namemanufacturer
1Motor & ReducerDomestic brands
2The main key bearingDomestic brands
3InverterShilin
4PLC SystemsSiemens
5Low-voltage electricalSchneide
6EncoderOmron
7touch screenSiemens
8Hydraulic systemDomestic brands

1.How to maintain the machine?
Answer: add mechanical lubrication equipment to chain, bearing and cutting slide every month. Add mechanical lubrication to the case every half a year.
2. Do you sell only standard machines?
A: No, most of our machines are built according to customers specifications, using top brand name components.
3.How many workers to operate the machine?
A:Only 1-2 workers.
4. How to visit your company?
a.Fly to Beijing airport: By high speed train From Beijing Nan Station to Cangzhou West Station(1 hour), then we can pick you up .
b.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou West station(4.5 hours), then we can pick you up.

5. What can you do if the machine broken?
Our machine's warranty period is 12months,if the broken parts can't be repaired,we can send the new parts to replace the broken parts for free,but you need pay the express cost yourself.if over warranty period,we can for to solve the problems via negotiation,and we supply the technical support for the whole life of the equipment.
6.How can I trust you that machines pasted testing running before shipping?
A: 1) We record the testing video for your reference. Or,
2) Please visit company and test machine if convenient.

Product Tag:
Related categories:
Scroll to Top