Four Vessel Beer Brewing Equipment
4 Vessel Brewhouses
Mash(kettle) Tun + Lauter Tun + Boil Kettle + Whirlpool
Our standard configuration of beer brewing equipment supply two vessel brewhouse and extra hot liquor tank. Also it can be customized according to customers demands. For finish brewing the beer, it also include grain miller, fermentation unit, glycol cooling unit, controling unit and cip cart unit. Our company have more than 15 years experience in this field and provide turnkey solution, if you also need other components such as keg filler or keg rinser etc. We also can give you a solution. Tiantai, you honest craft brewery builder.
Output/Brew | 10HL | 12HL | 15HL | 20HL | 25HL |
Brews/Week | 6~12 | 6~12 | 6~12 | 6~12 | 6~12 |
Output/Week | 60~120HL | 72~144HL | 90~160HL | 120~240HL | 150~300HL |
Electric Supply | 3phase/380(220, 415,440)v/50 (60)Hz Single Phase/ 220(110, 240v)/50(60)Hz | ||||
Heating Source | Steam/Directly Fired | ||||
Area Request | >70M2 | >80M2 | >100M2 | >120M2 | >140M2 |
1. Local service_ Local service and warehouse in Europe and Australia
2. Quality verified_ 5 years warranty; 19 years experience on beer equipment manufacturing
3. Transaction security_ More than 1100+ brewery project all over the world
4. One stop service _ Pre sale + Design + Production +Installation
5. Certification guarantee _ With ISO, CE, design and produce by ASME standard available
1) The brewhouse combination is MT + LT + KT + WT + HLT.
2) Agitator or Grain rake place in kettle tank or mash tank for agitating to get uniform mashing.
3) Two stage heat exchanger, the wort will be cooled by city water and glycol water.
4) Wort collect rings under the bottom of filter, which has 4 wort outlets. So the wort can flow through by multi routes rather than single route, it is good for speeding up filtering progress.
5) Anti-Rinser under the bottom of filter as well, which was designed 4 spray nozzles. It can be used for cleaning false bottom and loosen grain bed during lautering.
6) Hopback to add beer aroma by adding hop leaves inside.
7) With hydrator on the top of mash tun for malt pre-mashing.
Milling System | Mill machine | Stainless steel |
Grist case | Stainless steel | |
Flexible conveyor | Outer PPR or Stainless steel | |
Brewhouse System | Mash tun | -Inner:3mm; outer:2mm-Motor agitation-Steam jackets/Electric elements/Fire direct heating |
Lauter tun | -Inner:3mm; outer:2mm-Rack knife system -False bottom filter -Wort Grant | |
Brew Kettle | -Inner:3mm; outer:2mm-Steam jackets/Electric elements/Fire direct heating | |
Whirlpool Tank | -Inner:3mm; outer:2mm-Side tangent whirlpool inlet | |
Hot water tank | -Inner:3mm; outer:2mm-Steam jackets/Electric elements/Fire direct heating | |
Accessories | -Mash pump; Heat-exchange plate; Hop back system; Brewhouse Pipes; | |
Fermentation System | Fermentation tank | -Pressure:3 Bar-Inner:3mm; outer:2mm; with insulation -Cooling jackets |
Cooling System | Glycol water tank | -Inner:3mm; outer:2mm |
Cold water tank | -Inner:3mm; outer:2mm | |
Accessories | Chiller; Glycol water pump; Pipes & Valves | |
CIP System | Acid tank, Caustic tank, Trolley | -Pump; Pipes & Valves-Accessories of the CIP System |
Control System | -Automatic/Semi-auto | |
Filtering System | Candle type diatomite filter/Membrane filter/Bag filter | |
Bright beer tank | Double-layer with insulation | |
Filling System | Glass bottle line | Capacity:800-1200 BPH-Washing heads:8; Filling heads:8; Capping heads:3 -Optional: Capacity:1500-2000 BPH -Washing heads:16; Filling heads:16; Capping heads:6 |
Canning line | Capacity:1000-1500 CPH-Filling heads:12; Capping heads:1 | |
Keg system | Keg filling machine; Keg washing machine; Keg washing and filling unity machine |
Our company is a professional beer equipment manufacturer. We are specialized in professional design, manufacture, installation and commissioning of various beer equipments and supporting facilities for about 16 years and we got CE PED certificate, ISO9001 certificates as well
as Factory Audit report by SGS and TUV. Our products include mashing equipment, fermentation equipment, yeast spread cultivation equipment, and refrigeration equipment for small and medium-sized brewery, hotel, pub and etc.
1. One Stop Service from malt to beer
2. Design Customization: Tanks structure, pipeline, installation
3. 5 Years Warranty for tanks, free delivery for broken accessory within warranty
4. With ISO TUV SGS certificate, the product meets the GB/CE/PED/ASME standard
5. Local service in EUROPE, AUSTRALIA ETC
6. More than 1100+ global users
a.) Free consultation service before, during, and after sales; | ||||||
b.) Project planning and design services; | ||||||
c.) Free debugging instruction of equipment until everything is functional; | ||||||
d.) Management of equipments' long distance shipping from seller's factory to named port or station by buyer; | ||||||
e.) Training of equipment maintenance and operating personally; | ||||||
f.) New production techniques; | ||||||
g.) Provide 36 months complete warrantee for main parts and life-time maintenance service;The seller is responsible for the nature damage of the machinery in the warranty period except for man-made damage. All spare parts and wearing parts are attached with the machinery for free; |
1.Q:Does your company have foreign installation experience? A: Yes, our company has installation experience in USA, Canada, Europe, Australia, Malaysia, Myanmar, South Africa etc.
2.Q: Do you have a professional engineer or after-sales team in our country? A: Yes, our equipment is sold to 103 countries and areas and we have our local after-sales service personnel in Europe, America and Asia.
3.Q:How can you guarantee the delivery date of the equipment after we place the order? A: The delivery time can be ensured through Alibaba Credit Insurance orders.
4.Q:What payment methods are supported? A:T/T, L/C, Credit Card, VISA, Apple device, Western Union.
5. Q: How long the warranty will be? A: 5-year warranty, only for tanks, excluding electrical appliances, wearing parts such as cushions, seals, etc. (mixing seals, pump seals, butterfly valves and other valve seals), pumps.
6. Q:How about the installation and training? A:We can supply the installation and training. There are two options. The first option: We could appoint our engineer to your company to debug and repair, as for the cost of this trip such as ticket, visa, accommodation and labor cost shall be on your side. The second option: On-line service will be provided. If still under guarantee period, the necessary accessories and parts will be provided free, the buyer afford the transportation cost.
7.Q: Can I be your company's sales agent? A: Yes, it's our pleasure. We very much welcome you to join us. Please contact us to discuss specific details. 8.The price does not include electrical appliances, etc.