GK-200 drilling rig is a portable and multi-purpose engineering exploration and construction drilling rig, which is suitable for geological exploration of industrial, civil buildings, railways, bridges, hydropower projects, and small-diameter pile hole construction.
Scope of application:
Geological census and exploration, geophysical exploration, mine prospecting, water well drilling, slope reinforcement holes, road and building exploration and other drilling projects.
Rig Features:
1. Equipped with hydraulic automatic feeding mechanism to improve drilling efficiency and reduce manual labor of workers;
2. The ball clamping mechanism is used instead of the chuck, which can realize the reverse lever without stopping, which is easy to operate, safe and reliable;
3. Equipped with a pressure gauge at the bottom of the hole to indicate the pressure, which is convenient for grasping the situation in the hole;
4. The handle is centralized and easy to operate;
5. The structure is compact, the drilling rig, water pump and diesel engine are all installed on a base, occupying a small area of the airport;
6. Light weight, strong decomposability, easy to relocate, suitable for work in plains or mountainous areas.
GK200 Drill Rig Technical parameter | |
Rig | |
Drilling diameter(mm) | 75,91,110,130,150,300 |
Drilling depth (m) | 200,150,100,70,50,30 |
Drill pipe diameter (mm) | 42,50 |
Drilling angle(°) | 90~75 |
Equipment size(L * B * H) | 1730 * 860 * 1360 (mm) |
Rig weight (except engine) | 600 |
Mobile device | |
Moving length | 350mm |
Leave distance | 300mm |
Gyrator | |
Spindle speed (four gear) (r/min) | 115,230,505,1010 |
Spindle travel(mm) | 450 |
Spindle no-load lifting maximum moving speed(m/s) | 0.05 |
Spindle no load drop maximum movement speed(m/s) | 0.067 |
Spindle maximum feed pressure(KN) | 15 |
Spindle maximum lifting force(KN) | 25 |
Spindle maximum output torque(KN• m) | 1.5 |
Winch assembly | |
Winch maximum lifting force (single rope) | 20 |
Reel speed (r/min) | 20,39,85,170 |
Reel circumferential speed(m/s) | 0.172,0.345,0.738,1.476 |
Reel diameter(mm) | 140 |
Wire rope diameter(mm) | 9.3 |
Wire rope density (m) | 40 |
Brake diameter(mm) | 278 |
Brake band width (mm) | 50 |
Oil pump | |
Oil pump type | YBC -20/125 |
Nominal pressure (Mpa) | 12.5 |
Rated flow(ml/r) | 20 |
Rated speed(r/min) | 800-2500 |
Diesel engine or motor | |
Diesel engine | 1115 |
Rated power (KW) | 16.2 |
Rated speed (r/min) | 2200 |
Rated pressure(Mpa) | 12.5 |
Motor type | Y160M - 4 |
Rated power (KW) | 11 |
Rated speed (r/min) | 1460 |
Shijiazhuang WeiLiDa Prospecting Machinery Co., Ltd. is a professional manufacturer of drill pipe, drilling rig and other drilling tools. Our factory is located in Jinzhou, Shijiazhuang . 200 km from the capital Beijing. We have good export conditions to Tianjin port and Huanghua port. Our factory covers an area of 20000 square meters. Its total assets is 50 million yuan.
Our company has advanced friction welding, drill pipe thickening equipment and a variety of molding technology and processing equipment. According to the customer's requirements, we can produce various specifications of the drill pipe and connecting parts of the United States standards. At the same time, we are also equipped with a set of physical and chemical testing machine on the hydraulic pressure, heat treatment, no damage, etc. to ensure the quality of products. At the beginning of the establishment, we passed the certification of CQC and ISO9001. Through years of manufacturing experience and customer's use of reflection, the application, safety and reliability of the domestic industry of our products have reached a leading level. We adhere to the "quality first, reputation first" business philosophy. We do our best to meet the customers' need .We are very pleased to establish a long-term business relationship with you on the basis of mutual benefit. We believe that we will be your best partner in China
Provide online installation guidance services
1. What about the warranty time?
A:15 days
2. What about the delivery time?
A:10-15days after receiving the deposit.
3.What kind terms of payment can be accepted?
A: T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment
4.What logistics ways we can work for shipment?
A: We can ship machine by sea and road.