Tder Fobs Cabin 3 Cubic Meters Diesel Concrete Mixer Cheap Cement Mixers for Sale

Min.Order: 1
Product origin: Xiamen, Fujian, China
Infringement complaint: complaintComplaint
US$ 20370 ~ 24492

Description

TDER FOBS cabin 3 cubic meters diesel concrete mixer cheap cement mixers for sale

MODEL
TCM30
Vehicle parameters
1
Integrated structure, rear wheel steering
The drum rotates 270 ° and can be lifted and lowered
 
2
overall dimension (L*W*H)
7000*2540*4000mm
 
3
wheel base (mm)
2160mm
 
4
wheel tread
2130mm
 
5
Curb Weight(kg)
6500kg
 
6
Maximum speed (km / h)
40
 
7
Maximum climbing gradient
45°
 
8
Steering angle
28°±1.5°
 
9
Braking form
 
Engine
10
YN38GBZ
YN38GBZ
 
11
type
4-cylinder inline, direct injection, water-cooled, four-stroke, supercharged
Transmission system
16
torque converter
280Split gearbox torque converter
 
17
gearbox mode
280Power shift transmission
 
18
gears
4 forward shift 4reverse shift
 
19
maximum speed
40km/h
Mixing and unloading
20
Geometric volume of drum
4.5m³
 
21
Rotation speed of drum
15-20 rpm
 
22
Concrete output
 2.5-3m³/Batch
 
23
 Drum lift time
3.5s
Brake system
27
service brake
Air brake
 
28
parking brake
Manual disk brake
Tyre
29
type specification
23.5/70-16 Rail tyre
 
30
front tyre pressure
0.5Mpa
 
31
rear tyre pressure
0.4Mpa




1.What's the Certificate do you have?
TDER workshop meet with the ISO9001:2008 Quality System. All of our products with CE certificate. 

 2.Can you customize and design as the clients' requirement?
TDER will try its best to meet all kinds of clients' special requirements. However, All the customizing
and refit should be implemented safely and scientifically. The colors can be painted as client's need.

 
3.How long is the warranty of your products?

Normally 1 year or 2000 working hours whichever occurs first. Details to see the TDER warranty
policy for each model.

 
4.Can you produce the products labeled with the client's brand?

With the authorization of the brand, we can OEM for our clients.

 5.What's the payment terms do you accept?
On T/T term 30% down payment is required in advance,and 70% balance shall be settled before shipment.

 6.What logistics ways we can work for shipment ?
We can ship construction machinery by various transportation tools.
1.For 90% of our shipment,we will go by sea,to all main continents such as South America,Middle East,
Africa,Oceania and Europe etc,either by container or Bulk shipment.

2.For neighborhood countries of China,such as Russia,Mongolia, Kazakhstan,Uzbekistan etc., we can
ship trucks by railway.

3.For light spare parts in urgent demand,we can ship it by international courier service,such as DHL,
TNT,UPS,or Fedex.


7.Delivery time:
Standard configuration products are always in stock. The production period of Customizing products is
30 days.

Product Tag:
Related categories:
Scroll to Top