DTS food and beverage industrial retort and autoclave made in China
Dairy: Tin can, plastic bottle, bowl/cup, glass bottle/jar, flexible pouch packaging
Flexible packaging meat, poultry, sausages
Large size flexible packaging fish, seafood
Large size flexible packaging ready to eat meal
Packing materials applicable to the water immersion retort
Uniform water flow distribution:
By switching the water flow direction in the retort vessel, uniform water flow is achieved at any position in the vertical and horizontal directions. An ideal system for dispersing water to the center of each product tray to achieve uniform sterilization without dead ends.
High temperature short time treatment:
High temperature short time sterilization can be performed by heating hot water in a hot water tank in advance and heating from high temperature to sterilize.
Suitable for easily deformed containers:
Because water has buoyancy, it can form a very good protective effect on the container under high temperature state.
Suitable for handling large packaging canned food:
It is difficult to heat and sterilize the central part of large canned food in a short time by using a stationary retort, especially for food with high viscosity.
By rotating, the high viscosity food can be evenly heated to the center in a short time, and achieve effective sterilization effect. The buoyancy of the water at high temperature also plays a role in protecting the product packaging during the rotating process.
Q: What methods of payment are acceptable?
A: FOB, CFR & CIF optional; It's mainly depend on client's requirement;
Accepted payment types: T/T, L/C;
Q: What can you buy from us?
A: Water spray retort, immersion retort, steam retort, steam and air retort, rotary retort, lab retort, tunnel pasteurizing and cooling machine
Q: How can we guarantee the quality?
A: Always a pre-production sample before mass production;
Always make a final inspection and trial running before delivery;
Q: Do you have machines in stock?
A: Yes, but just the small-scale machines. Machines are different with other products, most of the large-scale machines are designed according to our customers' requirements.
Q: What's the lead time after placing order?
A: Usually it takes about 2-3 months after we received your deposit. However, it would depend on our production line schedule (the timing clients place order) and the complication of the item.
Q: What is the cost of shipping?
A: Shipping cost is based on the following elements:
1.Type of container needed
2. Number of packages
3. Gross weight
4. Package volume
5. Destination port
Q: What is the installation and training methods?
A: Our engineer will inspect and guide the installation of the equipment and the connection of the pipeline on site until the equipment is running smoothly.