Metal Foundry Factory Provide Low Price Large Aluminum Die Casting Aluminum Alloy ADC12, A380 OEM ODM From 3 G --- 20kgs Easteel

Min.Order: 1
Product origin: Changzhou, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 0.1 ~ 10

Description
 
 

Key attributes

Other attributes

Place of Origin
JIANGSU, China

 

Brand Name
OEM

 

Model Number
Nonstandards

 

Process
Investment casting

 

Material
Stainless steel

 

Service
Casting/Machining

 

Dimensions
Customized Sizes

 

Application
Industry

 

Standards
AISI,ASTM,DIN,EN,JIS.GB etc.

 

Packaging and delivery

Packaging Details
Carton, Iron Pallets,Wooden Pallets, Or as your demand.

 

Port
SHANGHAI

 

Supply Ability

Supply Ability
50000 Piece/Pieces per Month Metal Casting Machine Parts



Our Equipment







We now have 200 customers from all over the world.
1. We have own factory and 80% of staff in our company worked for more than 10 years.
2. We provide a competitive price.
3. High precision, tolerance can be within ±0.01mm.
4. 14 years' export experience.
5. Small order also is welcomed.
6. We provide one-stop service, including mold and assembly.
7. All your information is confidential, and we can sign NDA as well.

CERTIFICATE
CUSTOMER FEEDBACK

FAQ
Q1. Are you a factory or trade company?
We are a factory located in 6th Building, No 51, Nanhuan Ave, Gongming, Shenzhen, 518106, China.
Welcome to visit our factory.

Q2. What kind of production service do you provide?
Mold making, die casting, CNC machining, stamping, plastic injection, assembly, and surface treatment.

Q3. How about the lead time?
Mold: 3-5 weeks
Mass production: 3-4 weeks

Q4. How about your quality?
♦We have got ISO9001:2015 and IATF16949 certificates.
♦We will make the operation instruction once the sample is approved.
♦We will 100% inspect the products before shipment.
♦Transactions can be through Alibaba's trade assurance.

Q5. How long should we take for a quotation?
After receiving detailed information(your 2D/3D drawings or samples), we will quote you within 2 days.

Q6. What is your quotation element?
Drawings or Sample, Material, Finish, and Quantity.

Q7. What is your payment term?
Mold: 50% prepaid, balance after sample approval.
Goods: 50% prepaid, balance T/T before shipment.
Product Tag:
Related categories:
Scroll to Top