Drilling Tool API Tong Dies, Slip Jaws and Inserts

Min.Order: 10
Product origin: Dongying, Shandong, China
Infringement complaint: complaintComplaint
US$ 2 ~ 5

Description
Dies and Inserts for Elevators, Slips, Tongs in Oilfield Drilling Industry

Product Description

Manual or power tongs are used to tighten or loosen joints (tool joints) when inserting or extracting tubing on oil rigs.

Dies are the main elements of hand and power pliers, performing the job of clamping the tool joints before torque is applied. (Rollers or chains can also be used to clamp the pipe when using the reel).

1. Manual tong dies and slip inserts are all made of high-quality alloy steel.

2. After chemical heat treatment to improve surface hardness.

3. Wear-resistant, corrosion-resistant, long service life.

4. Customized according to customer requirements.


 

 

Detailed Photos

 

Product Parameters

ProductPipe size(in)ProductPipe size(in)
W-SDS rotary slips2 3/8-4 1/29 drill collar slips9
W-SDML rotary slips2 3/8-5 1/2Casing slips6 5/8-30
W-SDXL rotary slips3 1/2-5 1/2WA-C safety cafety3 1/2-15 5/8
3 1/2-5 rotary slips3 1/2-5WA-T safety clamps1 1/8-4 1/2
5 -7rotary slips5-7QQP60-89/585 pneumatic spider2 3/8-3 1/2
W3 1/2/75(125) rotary slips2 3/8,2 7/8,3 1/2QQP60-89/675 pneumatic spider2 3/8-3 1/2
W5/75(125,200)rotary slips4,4 1/2,5QQP60-127/900 pneumatic spider2 3/8-5
DCS-S drill collar slips3-4 7/8Well repair manual tongs2 3/8-10 3/4
DCS-S drill collar slips4 1/2-7B manual tongs2 3/8-10 3/4
DCS-S drill collar slips6 3/4-14DB manual tongs3 1/2-17
WT drill collar slips4 1/2-11 3/413 3/8 casing manual tongs13 3/8-14
8 drill collar slips8Q13 3/8-30 casing manual tongs13 3/8-30

Company Profile

FAQ

1) How can I place an order?

A: You can contact us by email about your order details, or place an order online.

2) How can I pay you? 

A: After you confirm our PI, we will request you to pay. T/T and Western Union are the most usual ways we are using. 

3) What's the order procedure?

A: First we discuss order details and production details by email or TM. Then we issue you a PI for your confirmation. You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25days if we don't have the items in stock. Before production has finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you. 

4)How do you take care when your clients received defective products?

A: replacement. If there are some defective items, we usually credit them to our customer or replace them in the next shipment. 

5)How do you check all the goods in the production line?

A: We have spot inspection and finished product inspection. We check the goods when they go into the next step production procedure.

Product Tag:
Related categories:
Scroll to Top