HD/LD PE Film Blowing Machine
Its extruder, cylinder and screw rods are made of quality alloy steel that have been nitrized and processed in a precision way. Hence it is sound in hardness, durable in corrosion resistance. The specially-designed screw is of sound quality in plasticizing, which helps increase the production capacity. It is applied to blowing the plastic films like low density polygene (LDPE), high density polytene(HDPE) and linear low density polytene (LLDPE). It is widely applied to producing the packing bags for foodstuff, clothing, rubbish bag and vest ones.
Model | XY-A50 | XY-A55 | XY-A60 | XY-A65 |
Raw material | HDPE, LDPE, LLDPE | |||
Screw | φ50 | φ55 | φ60 | φ65 |
L/D | 28:1 | 28:1 | 28:1 | 28:1 |
Max.Folding Width of Film | 600mm | 800mm | 1000mm | 1200mm |
Single-sided Thickness of Film | 0.01-0.10mm | 0.01-0.10mm | 0.01-0.10mm | 0.01-0.10mm |
Main motor | 11kw | 15kw | 18.5kw | 18.5kw |
Max Output | 35kg/h | 55kg/h | 65kg/h | 80kg/h |
Total power | 20kw | 25kw | 30kw | 40kw |
Weight | 1.5T | 2T | 2.3T | 2.6T |
Outline diameter | 5*2.2*4.2m | 5*2.4**4.8m | 6.5*2.3*4.9m | 6.5*2.5*5.6m |
1. Are you factory or trading company ?
We are factory specialized in plastic machine for many years, also we have the right to export goods by ourselves.
2. Where is your factory? How can i visit your company?
Our factory is located in Ruian city,zhejiang province, China. Its about 40 minutes from shanghai by plane(4 hours by train). We will pick you up on airport or station.
Welcome to visit our factory
3. How long is your delivery time?
Normally our delivery time is 15-30 days. If you need it ugently, we can make it about7 days
4. What are your terms of payment?
We accept 30% deposit, balance before shipment. And Irrevocable L/C at sight.
5. What package do you use for the product?
Be Coated with anti-corrosion oil, and covered with plastic film, wooden box package need extra cost.
6. Does your factory provide installation service?
Our engineer can go to customer factory to installation. Customer should prepare materials used to testing the machine in advance and should be responsible for the cost of supplier's technician, including round air tickets, visa cost, accommodation and salary 100USD/Day per person since the day start out until the day arriving at factory.
7. What's your warranty policy?
12 month guarantee and whole life maintance.
8. What is your company after sale service?
We would express the free replacement parts as soon as possible.