Design/Size | According to customer's drawing or samples |
Material | Aluminum:6061, 6063, 6082, 7075, 5052, A380 etc. Stainless Steel:SS201, SS301, SS303, SS304, (SS304 FOOD GRADE), SS316,SS316L,SUS430, SS416 Steel: Mild steel, Carbon steel, 4140, 4340, Q235, Q345B, 20#, 45# etc. Alloy steel (15Cr,20Cr,42CrMo) and other etc. Brass:HPb63, HPb62, HPb61, HPb59, H59, H68, H80, H90 etc. Copper,Bronze,Red copper,etc. Titanium: TC4 (TiAl6v4, Gradef5) Plastic:ABS, PC, PE, POM, Delrin, Nylon, plastic, PP,PEI, Peek etc. |
Process | Cutting,Bending, Turning, Milling, Stamping,Lathing, Welding, etc. |
Leadtime | 3-7 working days for samples generally, mass production as per detail qty after samples approval. |
Surface Treatment | Clear Anodized,Color Anodized,Chemical Film, Brushing, Passivating, Polishing, Chroming,Sandblasting, Laser engraving,Zinc plating,Oxide black,Nickel plating,Chrome plating,Carburized,Heat treatment,Painting |
Test Equipment | CMM, 2D Measurement instrument,Projector,Altimeter,Micrometer,Thread Gages,Hardness Tester, Calipers, Pin Gauge,Salt Spray Test Machine,Concentricity Measuring Instrument Concentricity Measuring Instrument,Spectrometer. |
Quality Management System | ISO 9001,IATF 16949,ISO14001,ISO45001,ISO13485 |
Application | Medical equipment manufacturing,computer parts,home appliances parts,electrical equipment parts,electrical appliances parts,electronic products parts,electronic parts,generator parts,alternator parts,dynamo parts,electric generator parts,stationery,power switches,miniature switches, architecture, commodity and A/V equipment.Renewable Energy Data Centers & Infrastructure Utility & Industrial Telecom/Broadband ,Self-Service Kiosk |
File Format | Solidworks,Pro/Engineer,CAD,PDF,JPG,DXF,IGS |
Packing | Inner-Plastic bag,Outer -Standard Carton Box,or according to customers' requirements |
Shipping | By sea, by air, International Express(DHL,FedEx,TNT,UPS). |
Service | Warm and quick response service by the professional foreign trade team. Size inspection report/Raw material certification/Surface treatment report/Engineering drawing RoHS report/Salt spray test report/Hardness test reort |
Q1.How can we guarantee quality?
Always a pre-production sample before mass production;
Always final Inspection before shipment.
Q2.What's the production time for new molds and mass production?
10-20 days to make the new moulds, mass production takes around 15 days,can process urgently if need.
Q3.Can you send me samples?
Yes, Samples are for free, and freight is on your side.
Q4.What kind of production service do you provide?
Mold making, all kinds of casting, CNC machining, stamping, plastic injection, assembly, and surface treatment.
Q5.What is the payment terms?
T/T: 30% deposit, the balance will be paid after B/L copy;
L/C: the balance irrevocable L/C at sight.
Q6.Why should you buy from us not from other suppliers?
Quicker response: 24 hours for quotation;
Dependable quality ISO9001;
Excellent Team Positive, flexible, passionate;
High business reputation Maintain long smooth relationship with clients.