Sun Hydraulics Dccfxcn Cartridge Valve Hydraulic Solenoid Valve

Min.Order: 1
Product origin: Ningbo, Zhejiang, China
Infringement complaint: complaintComplaint
US$ 588 ~ 1288

Description
1 YEAR WARRANTY AND EXCELLENT SERVICE
7 DAYS REFUND PAYMENT IN CASE OF QUALITY
24 HOURS SMOOTHLY COMMUNICATION
 
Offers original and replacement SUN hydraulics DCCFXCN Series  pressure switch for our customers. We will save customer costs, increase productivity and profit margins, Welcome to Get Latest Price now!
 
Product Description

Cavity   T-61A
Series   1
Capacity   7 - 10 gpm
Minimum Pilot Pressure Required to Shift Valve   175 psi
Maximum Valve Leakage at 110 SUS (24 cSt)   2 in³/min.@1000 psi
Pilot Volume Displacement   .02 in³
Valve Hex Size   7/8 in.
Valve Installation Torque   30 - 35 lbf ft
Model Weight   0.46 lb.







Two-position, 4-way directional cartridges are spring-offset, 6-port directional valves that can be configured from a choice of 9 different spool options. The supply port is port 3 and all ports will accept 5000 psi (350 bar). Capacity for these pilot-to-shift valves is dependent on the spool type specified.

Detailed Photos



Company Profile

FAQ

Q: Are you trading company or manufacturer?
A: We are factory with more than 20 years experience.

Q: How long for delivery?
A: Generally it is 15-30days as we are customized service we confirm with customer when place order.

Q: What is the MOQ?
A: It depends on what you are buying. Normally, our minimum order is one 20' full container and LCL container (less than a
container load) can be acceptable.

Q: Can you customize my products?
A: Yes, we can customized products with your design drawings like DWG, DXF, DXW, IGES, STEP, PDF etc.

Q: What is your terms of payment?
A: 30% T/T in advance, balance before shipment, or as per discussion.

Q: What about your quality control?
A: * . Checking the raw material after they reach our factory-----Incoming quality control(IQC)
* . Checking the details before the production line operated
* . Have full inspection and routing inspection during mass production----In-process quality control(IPQC)
* . Checking the goods after they are finished----Final quality control(FQC)
* . Checking the goods after they are finished----Outgoing quality control(QC)
* . 100% inspection and delivery before shipment

Product Tag:
Related categories:
Scroll to Top