Sun Hydraulics Rdjalan Cartridge Valve Hydraulic Solenoid Valve

Min.Order: 1
Product origin: Ningbo, Zhejiang, China
Infringement complaint: complaintComplaint
US$ 588 ~ 1288

Description
1 YEAR WARRANTY AND EXCELLENT SERVICE
7 DAYS REFUND PAYMENT IN CASE OF QUALITY
24 HOURS SMOOTHLY COMMUNICATION
 
Offers original and replacement SUN hydraulics RDJALAN Series  pressure switch for our customers. We will save customer costs, increase productivity and profit margins, Welcome to Get Latest Price now!
 
Product Description

Cavity   T-18A
Series   4
Capacity   200 gpm
Factory Pressure Settings Established at   4 gpm
Maximum Operating Pressure   5000 psi
Maximum Valve Leakage at Reseat   10 drops/min.
Response Time - Typical   2 ms
Reseat   >90% of setting
Adjustment - No. of CW Turns from Min. to Max. setting   6
Valve Hex Size   1 5/8 in.
Valve Installation Torque   350 - 375 lbf ft
Adjustment Screw Internal Hex Size   5/32 in.
Locknut Hex Size   9/16 in.
Locknut Torque   80 - 90 lbf in.
Model Weight   3.30 lb.



Direct-acting relief cartridges are normally closed, pressure-limiting valves used to protect hydraulic components from pressure transients. When the pressure at the inlet (port 1) reaches the valve setting, the valve starts to open to tank (port 2), throttling flow to limit the pressure rise. These valves are smooth and quiet, essentially zero leak, dirt tolerant, immune to silting and are very fast.

Detailed Photos



Company Profile

FAQ

Q: Are you trading company or manufacturer?
A: We are factory with more than 20 years experience.

Q: How long for delivery?
A: Generally it is 15-30days as we are customized service we confirm with customer when place order.

Q: What is the MOQ?
A: It depends on what you are buying. Normally, our minimum order is one 20' full container and LCL container (less than a
container load) can be acceptable.

Q: Can you customize my products?
A: Yes, we can customized products with your design drawings like DWG, DXF, DXW, IGES, STEP, PDF etc.

Q: What is your terms of payment?
A: 30% T/T in advance, balance before shipment, or as per discussion.

Q: What about your quality control?
A: * . Checking the raw material after they reach our factory-----Incoming quality control(IQC)
* . Checking the details before the production line operated
* . Have full inspection and routing inspection during mass production----In-process quality control(IPQC)
* . Checking the goods after they are finished----Final quality control(FQC)
* . Checking the goods after they are finished----Outgoing quality control(QC)
* . 100% inspection and delivery before shipment

Product Tag:
Related categories:
Scroll to Top