8kg Light Steel Rail for Amusement Park Railway 12kg Rail for Farm Application

Min.Order: 10
Product origin: Liaocheng, Shandong, China
Infringement complaint: complaintComplaint
US$ 599

Description
Product Description

 

Parameters of Railroad Tracked Rails Standard Light/Heavy/Crane Railway Track Steel Rail
THE LIST OF YYGT
Name of CommoditySpecificatonMaterials (Steel Grade)Standard of ProductsTheory Weight (kgs/M)Length of Dimension (M)Packed In Bundle With Iron Wire (pcs/bundle)
Light Rail4kgs/mQ235Q/YG001-20144kgs/m6,875
8kgs/mQ235Q/YG001-20148.42kgs/m55
12kgs/mQ235GB11264-201212.2kgs/m36
15kgs/mQ235/55QGB11264-201215.2kgs/m6,8,9,1028
18kgs/mQ235/55QQ/YG001-201418.06kgs/m21
22kgs/mQ235/55QGB11264-201222.3kgs/m21
24kgs/mQ235/55QQ/YG001-201424.46kgs/m21
30kgs/mQ235/55QGB11264-201430.1kgs/m15
Heavy Rail38kgs/mU71MnGB2585-200738.733kgs/M12,12.510
43kg/mU71MnGB2585-200744.653kgs/M10
50kgs/mU71MnGB2585-200751.514kgs/M10
 45/50MnQ/YYG002-200831/34/36/39/41kgs/M12,12.510
Crane RailQU70U71MnYB/T5055-9352.8kgs/m1210
QU80YB/T5055-9363.69kgs/m10
QU100YB/T5055-9388.96kgs/m5
QU120YB/T5055-93118.1kgs/m5

Packaging & Delivery


1. Packing: it is nude packed in bundles by steel wire rod

2. Bundle weight: not more than 3.5MT for bulk vessel; less than 3 MT for container load

3. Marks:

Color marking: There will be color marking on both end of the bundle for the cargo delivered by bulk vessel. That makes it easily to distinguish at the destination port.

Tag mark: there will be tag mark tied up on the bundles. The information usually including supplier logo and name, product name, made in China, shipping marks and other information request by the customer.

If loading by container the marking is not needed, but we will prepare it as customer request.

4. Transportation: the goods are delivered by truck from mill to loading port, the maximum quantity can be loaded is around 40MTs by each truck. If the order quantity cannot reach the full truck loaded, the transportation cost per ton will be little higher than full load.

5. Delivered by container or bulk vessel
 
  1. Delivery Time: All the Hot Rolled Steel Rail will be transpoted at the port of Shanghai, China within 30 days after receiving the advance payment by T/T or the orginal L/C at sight.
Scroll to Top