Multi-Layer Function Nonwoven Fabric Automatic Thermal Film Wet PUR Laminating Machine

Min.Order: 1
Product origin: Wenzhou, Zhejiang, China
Infringement complaint: complaintComplaint
US$ 70000

Description
 
Product Description


1.Features
1) Hot melt adhesive laminating machine series
2) Used for producing self-adhesive products, such as self-adhesive tape, double-adhesive tape, foam tape, aluminum foil tape, clean tape, masking 3) 
It suitable for laminating different materials, such as non-woven, paper, filter materials, shoes materials, medical material, label, filem, etc.

 

 

Product Parameters

 
 

ItemSpecification
 DCL-M1300 /   DCL-M1700
Extrusion die width1400mm    /    1600MM
Coating width600-1250mm    /    900-1600MM
Max coating speed80-150m/min    /  100~150m/mi
Adopt materialNon woven/ BOPP/Aluminum foil
Coating thickness0.01-0.05mm /0.008-0.05mm
Inaccuracy thickness of coating film±6% /±5%
Setting range of Auto-tension10-200kg/ 10-150kg /entire width (constant tension)
L/D ratio for screw32:1
Rewinding roll diameterØ1300mm
Compound cooling rollerØ500×1300mm /Ø500×1700mm
Max extrusion260kg/h /200kg/h
Total power130KW
Working power70-80kw /80-95kw
Overall sizeL 9800* W 8000* H 3200mm /L9600*W10000*H3250mm
Weight of Machine15000KGS (40HQ*1, 20HQ*1)


Main equipment and Description
 

NoItem
 
Quantity
 
1Feeding Equipment
 
1set
2Extrusion And Compounding Equipment
 
1set
3ExtrusionEquipment
 
1set
4Second Feeding Equipment
 
1set
5Rewinding Equipment(surface friction)
 
1set
6ControlUnit
 
1set
7SupportingFacility
 
1set
8Tools 
 
1set
Additional Function (can be added)
 
9CoronaProcessingDevice
 
1set


 

 

Application

 
This Non Woven Laminating Machine is applicable to professional non-woven, film, the paper class material intercept.Widley used in bag making, printing and packaging industry, etc.
RE:Adopt Material:Non Woven / BOPP /Aluminum foil.

 

Detailed Photos

  
Packaging & Shipping

 


 
Company Profile

Hot Selling Machines

DCWZ-XB700/XB800
Fully Automatic Non Woven Bag Making Machine
DCZZ-A330/A400/A550
Automatic square bottom paper bag making machine
DCTY-1200
Computer Control High Speed Rotogravure Printing Machine
DCWZ-D500
Non Woven U-cut Bag Manufacturing Machine
DCZZ-C270/C330
V Bottom Paper Bag Machine
FAQ

Q1. How to install and operate the machine?

Due to the Global Epidemics we can not send the engineer , will provide the manual and installation video.

After the global epidemic end, The seller will send 1 engineer to install, test the production line and train customers' workers in buyers' factory. It will take 1 week for whole installation and training.

Q2. What should we charge for your engineer?

The buyer should cover engineers' salary, visa cost, round-trip air tickets, accommodations, transportation in buyers' country, food, medical care, safety cost, and related cost happens in buyers' country. Also, the buyer should prepare enough labor, electric wire outside the control panel and tools for installations.

Engineer's salary is 
USD 80/day, depending on how the engineer make you satisfied. The date he arrives and leaves shall be counted as paid day.

Q3. How long is your machine's warranty period?

Warranty period for the delivered equipment will be 12 months after completion of erection but not later than 18months after shipment. In case any item proves to be defective and the damage is confirmed by seller's technicians within this period, the seller will at their choice either send engineer to repair or supply a new one for replacement free of charge on the basis of CNF delivery.

The above item does not include the parts, which have regular spares or the parts damaged from normal wear, abnormal operation, improper maintenance and inadequate civil works. The seller is not liable for any production loss under any circumstances.

Q4. How do we solve the machine problem after your engineer leaving?

Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our after sales specialist at any time. Engineers will help to take a solution video according your description.

Q5. How do you arrange packing for machine?

As per export standard, they will also be treated before delivery against damage and rusting.


Product Tag:
Related categories:
Scroll to Top