Industrial Thermal Fluid, Thermal Oil, Thermic Fluid, Thermo Oil, Hot Oil Heated Steam Generator, Pure Steam Generator, Unfired Steam Generator

Min.Order: 1
Product origin: Nanjing, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 20000 ~ 100000

Description
 

Product Description

Industrial Thermal Fluid, Thermal Oil, Thermic Fluid, Thermo Oil, Hot Oil Heated Steam Generator,
Pure Steam Generator, Unfired Steam Generator

Thermal fluid steam generators are a perfect solution for customers that need steam for their facility but do not want to spend the capital for a large-scale boiler operation. 



Biref Introduction

How does Industrial Steam Generators & Thermal Oil Boilers Work Together?


The hot thermal oil from the thermal oil boilers circulates through the tubes inside the steam generator so the efficiency of the heater has a direct impact on the efficiency of the steam generator. The tubes then heat the water in the shell of the steam generator to create the steam.

Unlike a fired boiler, the heated tubes in the steam generator never get hotter than the hot oil flowing through them. The most significant saving from a steam generator is the fact that, in most cases, they do NOT require a boiler operator. This should result in significant operating cost savings in comparison to a boiler, which most of the time, requires a licensed operator.

Advantages of Thermal Fluid Heated Steam Generators

Weighing your options between an industrial steam generator and a boiler for your facility? Keep in mind that thermal fluid steam generators have significant advantages over boilers, some of which include: Steam Generators
No explosive gases or gas fuel train
No burner to operate or service
No permit required for a burner or stack
Faster heat up time
Does not require a boiler operator

Shematic Diagram

Product Parameters

 
Rated Steam Output (t/h)246810
Design pressure(Mpa)0.8/1.00.8/1.00.8/1.00.8/1.00.8/1.0
Rated steam temperature(ºC)175/184175/184175/184175/184175/184
Feed water temperature(ºC)2020202020
Heating MediumThermal fluidThermal fluidThermal fluidThermal fluidThermal fluid
 

Company Profile



About US


Jiangsu soho Honry Imp. &Exp. Co., Ltd is a state-owned company, which hold SUTEX BOILER brand, and select the boiler maker as our ODM, which is a professional manufacturing company, founded in 1991, for boiler and pressure vessel processing, with more than 500 workers and 150 technical engineers. It holds S and U stamps of ASME Standards, Class-A boiler manufacturing license, D1,D2 pressure vessel manufacturing license, boiler & pressure vessel inspection certificate of China.
It has developed a series of progress technologies in the field of manufacturing of boiler pressure vessel with more than 30 years technical accumulation and innovation. It has more than 100 invention patents and utility model patents in such area of boiler combustion. Our boiler products cover power plant boiler, steam boiler, hot water boiler, thermal oil heater, waste heat recovery steam boiler, steam generator, etc.
Products are widely used in power generation, biomass, electric heating, chemical industry, textile industry, food industry, paper industry, pavement, plastics, rubber, and wood industry, etc. Until now, there are more than ten thousand clients all over the world. Our products are not only served in China, but also exported to such countries/regions as USA, Japan, Australia, Russia, Vietnam, Philippine, Malaysia, Indonesia, Pakistan, Kazakhstan, Iran, Egypt, and Africa, etc.


Workshop View


Ceritificate



Overseas Exhibition


After Sales Service

SUTEX offers its customers the following services for industrial steam/hot water boiler, thermal oil boile/heater and waste heat recovery boilers and steam generators:

Customized boiler designs.
Super quality boiler product
Installation and commissioning service
Operators training service
Lifetime maintenance service.

Clients be all over the world


Field Installation&Commission

 

FAQ

Boiler FAQs

Q: What different types of boilers are available?

DZL type steam/hot water boiler
SZL type steam /hot water boiler
SHL type steam /hot water boiler
WNS type steam /hot water boiler
SZS type steam /hot water boiler
SZW type steam /hot water boiler
CFB type steam boiler
YLW type thermal oil boiler/heater
YYL(W) type thermal oil boiler/heater
WNS type thermal oil boiler/heater
SZS type thermal oil boiler/heater
SZW type thermal oil boiler/heater
Waste heat recovery boiler
Steam generator

Q: What's the steam generator benefits?


No explosive gases or gas fuel train

No burner to operate or service
No permit required for a burner or stack
Faster heat up time
Does not require a boiler operator

Q: How long does an industrial steam generator last?

The normal service life of a steam generator is 10 to 20 years, provided that proper care and maintenance routines are applied to the feedwater /thermal oil and interior of the boiler.

Q: What services for industrial steam generator does SUTEX offer?

SUTEX offers its customers the following services for industrial steam boiler, thermal oil boiler and waste heat recovery boilers and steam generators:

Customized boiler designs.
Super quality boiler product
Installation and commissioning service
Operators training service
Lifetime maintenance service.

Q: What safety features do steam generators have?

Water level low alarm
Safety valve over pressure protection.
Automatic FWP on / off

Q: What is the lead time of SUTEX steam generator

The subject boiler will be delivered within 60 -90 days based on boiler capacity

Q: How does steam generators warranty work?

The subject boiler is covered by a twelve months warranty against mechanical and/ or factory defects from date of test-run or 18 months from the date of shipment whichever comes earlier.
SUTEX shall repair or replace the components, parts or accessories covered by warranty that had become inoperative within the warranty period but not covered caused by faulty operation from the buyer.
SUTEX will provide lifetime service for boiler with cost when its warranty expired.

Q: Who will be fitting my new steam generator?

Simply, a local professional boiler installing company will install the subject steam generator under SUTEX engineer's instruction and supervision

Q: How long will my installation & commissioning take?

Typically, the whole installation & commissioning work may take 15-45 days based on the subject boiler capacity.

Q: How often should I maintain my steam genarator?

Overhaul inspection and maintenance: 1-3 month
SUTEX will provide detail brochure regarding how and when to do maintenance work during steam generator running.





 
Product Tag:
Related categories:
Scroll to Top