2 Flutes Cutting Tool for Whole-Series of Steel Processing, Mold Industry, Auto Parts, Automation Equipment, Tooling Fixture

Min.Order: 11
Product origin: Changzhou, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 2 ~ 3

Description

Product Description

HRC45/HRC55/HRC58/HRC60/HRC65 Endmill& Drill
Coated:Altin/Tialn/Tisin/Tin/DLC/Nano/Diamond

1.Can be used for the processing of copper, cast iron, carbon steel, mould steel, stainless steel, taitanium alloy, tool steel, and heat-treated steel
2.Bring good surface roughness after processing
3.With highly heat-resistant ALTIN coating, can be used for high-speed processing
4.High toughness, using grain-sized carbon tungsten as the raw material
5.Help to increase the smoothness, reduce the friction coefficient,and improve the lathe efficiency, thus save more production time


Features
Anti-High Temperature And Wear Resistance, High Precision, Improve Processing Efficiency Of Machine Tool, Good Shockproof
Suitable For Hardness Under 55°Metal Steel, Carbon Steel, Alloy Steel, Cast Iron, Stainless Steel, And Other Materials.
-Round Handle, Chamfering, Easy To Use, Performance Stability.
-Tough And Wear Resistant.
-High Strength And Hardness.
-Durable In Use.
-Using New Ultra-Fine Fine Tungsten Steel Bar Grinding, High Rigidity, And Toughness.
-35 °Helix Angle + Double Edge Belt Design Makes The Milling Cutter
-More Wear-Resistant And Reduces Workpiece Burr During Machining.
-The Chamfer Layout Of The Handle Is Easier To Clamp, And The Quality Of Laser Marking Is Guaranteed.
-Blue Nano Series (Two Edge)
-Sharp And Wear-Resistant.

Application:
1, Used For Half Finishing, Plain Flank, Groove, and Slope Can Be Processed. Suitable For Milling Cooper, Cast Iron, Carbon Steel, Mold Steel,
2, Used In Milling Machine., CNC, Drill Press, and Engraving Machine. Metal, Carbon Steel, Mold Steel, Etc.Woodworking, Alloy Steel, Stainless Steel, Etc. High Rigidity, Widely Used In Shallow Slot, Profile Milling, And Finish Machining.


Item No.Diameter
D
Cutting Length
Lc
Shank Diameter
d
Overall Length
L
Flutes
         JLSEM22096501 383504
         JLSEM22096502 134504
         JLSEM22096503 1.544504
         JLSEM22096504 264504
         JLSEM22096505 2.574504
         JLSEM22096506 384504
         JLSEM22096507 4104504
         JLSEM22096508 5135504
         JLSEM22096509 5136504
         JLSEM22096510 6156504
         JLSEM22096511 7188604
         JLSEM22096512 8208604
         JLSEM22096513 102510754
         JLSEM22096514 123012754
         JLSEM22096515 143514804
         JLSEM22096516 1445141004
         JLSEM22096517 1645161004
         JLSEM22096518 1845181004
         JLSEM22096519 2045201004
         JLSEM22096520 4164754
         JLSEM22096521 42041004
         JLSEM22096522 5205754
         JLSEM22096523 52551004
         JLSEM22096524 6206754
         JLSEM22096525 63061004
         JLSEM22096526 64061504
         JLSEM22096527 8258754
         JLSEM22096528 83581004
         JLSEM22096529 85081504
         JLSEM22096530 1040101004
         JLSEM22096531 1050101504
         JLSEM22096532 1245121004
         JLSEM22096533 1255121504
         JLSEM22096534 1460141504
         JLSEM22096535 1660161504
         JLSEM22096536 1860181504
         JLSEM22096537 2070201504



1) When can I get the price?

We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.
 
2) How can I get a sample to check your quality?
After price confirmation, you can require for samples to check our quality.
3) How long can I expect to get the sample?
After you pay the sample charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3-5 workdays. You can use your own express account or prepay us if you do not have an account.
 
4) How long does the whole procedure be worked out?
After you place an order, the production handling time is about 30 days. We need 15 days to prepare all the stuff then 15 days for manufacturing.
 
5) What about the transportation and delivery date?
Normally we use shipment to transport the goods. It is about 25-40 days. It also depends on which country and port you are in.It could be shorter if you need to send the goods like Asian. If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.
 
6) Are you a trading company or manufacturer?
We are a professional manufacturer. 
 
7) Where is your factory located?
We are located in  Xixiashu Town, New North District, Changzhou City, Jiangsu, China.
 
 
8) How about your stock?
We have large quantity products in stock, regular types and sizes are all in stock.
 
9) Is free shipping possible?
We don't offer a free shipping service. We can have a discount if you buy a large number of products.

Product Tag:
Related categories:
Scroll to Top