Description
Introduction of The MachineThis series of machine is a plastic thermoforming equipment with integrated design of machine, electricity and gas, PLC control system, touch screen operation, sheet feeding-heating-molding-cutting - stacking one-time.
HY-63/78 is suitable for BOPS, PS, APET, PVC, PLA and other thermoplastic materials.It can form a variety of lids, boxes, dishes, trays,such as the lids of fast food box, sushi, paper bowl, aluminum foil, the trays of moon cake,pastry, supermarket,and it also can produce medical device packaging,like oral liquid tray, medicine injection tray.Machine made samples
ParameterForming Area | 630x780mm(24.9" x 30.7") maximum |
Depth of Draw | 125mm (5") maximum |
Knife Length | OPS:13000mm / APET:9000mm |
Material Thickness Range | 0.12-1.0mm (0.005"-0.040") |
Air Pressure | 0.7Mpa |
Air Consumption | 1500 Litres/min |
Cooling Water Consumption | 8 Litres/min |
Power Consumption | 10kw/hr(Approximate) |
Heating power | 30kw |
Motor power | 9kw |
Power Supply | AC 380V 50/60HZ |
Working speed | 600-1200 Cycles/hr |
Material Roll Diameter | 800mm(31.5") maximum |
Sheet Width | 810mm(31.9") maximum |
Machine Dimensions | 5600x1750x2500mm(220.5" x 69" x 98.4") |
Machine Weight | 5200kg |
Features
1. Use for forming BOPS/HIPS/PS/PVC/PET plastic sheets into various of boxes, dishes, trays, bowls and lids.
2. Combination of mechanical, electrical and pneumatic components, and it combines the material sending, heating, forming and cutting into one process. The final products already cut one by one. 3. The whole system is controlled a micro PLC, which can be operated in man-interface. And it is
apability reliable, safe and jarless, less error.
4. Servo motor drives the sheet transport system.
5. Has quickly production capacity, highly utilization ratios of plastic sheet, low air consumption and maintenance, beautiful final products, so it is a new generation ideal package equipment.
6. Telecommuting and memory reserve functions.Detailed Photos
About Service.
Q: What's your delivery date?
A: Usually finish the production within 30 days after your 30% advanced payment, actually need to check according to our stock & production plan.
Q: Terms of payment?
A: We accept T/T, 30% in advance and 70% balanced against B/L copy.
We accept L/C at sight.
Q: How many days will you finish installing?
A: We will finish installation and training within 30 days.
Q: How long is your machine's warranty period?
A: All our machines have one year guarantee, starting from the finished installation.
Q: How could we do after one year warranty period?
A: We also can do service for you, if require overseas service, you need pay salary to our technician 150 USD/day.
Q: How could we do if the parts are broken within the warranty?
A: We would express the free replacement parts during the warranty date.