[Axis] 100m Deep Borehole Grouting Packer Grouting Plugs

Min.Order: 5
Product origin: Shijiazhuang, Hebei, China
Infringement complaint: complaintComplaint
US$ 50 ~ 100

Description
All online products are only for display, please contact the sales staff to verify specifications and prices.

[Axis] 100m deep borehole grouting packer grouting plugs



Application:
The grouting plug is widely used in hydro fracture hole sealing, grout injection and gas drainage at coal and iron mines.
Usage Instructions:
1. Connect all pipeline system and fasten the air source or water pump, and then insert the grouting plug at the hole opening or a steel pipe with the other end sealed, to test the pressure and to check the connectors for leakage. After that, put the grouting plug into the hole for future use.
2. Open the air cylinder or water pump to let the expansion plus expand slowly. Mind that the
inflation pressure must be greater than 2/3 of the grout injection pressure, and the grout injection may be started when the preset pressure is realized.
3. After the grout injection operation is started, when
large amount of grout overflows from the return outlet, increase the pressure slowly to the preset grout injection pressure,otherwise, large pressure difference may be produced. During the grout injection process, regular inspection should be made to the cylinder pressure, and replace the cylinder when the pressure drops.
4. Since the grout injection takes a long time period, attentions should be paid to
channeling, blockage and backflow phenomena, if such phenomena occur, the grout injection operation should be stopped and the pressure should be released. Then loosen the inflation plug to protect the plug from being blocked and stuck.
5. After grout injection operation is completed, release the grout injection pressure and then release the inflation pressure to prevent grout ejecting at high speed
and causing accidents.
6. After the grout injection operation is completed, put the grout injection plug into a steel pipe with the other end sealed, and then inflate the plug by 0.5 Mpa and clean the plug by
repeating the process.
7. After the grout injection plug is taken out, connect the water pipe with the grout inlet and return pipes to clean them.
8. When grout injection is carried out simultaneously at several
holes, all pipes should be arranged in rows and should not be twisted with one another, in order to prevent accidents and impact to operation at other holes.
9. After the plug is being in use for a long period,
the plug should be disassembled from the lower end to clean and to apply grease.
10. If long cracks or fracture is detected in the hole, they may cause channeling, blockage or backflow. In such cases,
another air supply pipe should be connected to the upper end of the grout injection plug. When channeling, blockage or backflow occurs, high-pressure air may be used to clean the plug and protect it from being blocked.
 
Model
 
Inside Diameter
 
Outside Diameter
 
Free-Expansion Outside Diameter
 
Applicable Aperture
 
Working Pressure
 
Proof Pressure
 
Burst Pressure
 
mmmmmmmmmmMpaMpaMpa
Φ32-2
 
32±0.5
 
50±1
 
90+8-4
 
6061224
Φ38-2
 
38±0.5
 
55±1
 
95+8-4
 
6551020
Φ45-2
 
45±0.5
 
63±1.5
 
100+8-4
 
754816
Φ45-4
 
45±0.5
 
69±1.5
 
100+8-4
 
75162432
Φ51-2
 
51±0.5
 
75±1.5
 
110+8-4
 
904816
Φ51-4
 
51±0.5
 
75±1.5
 
110+8-4
 
90162432
Φ64-2
 
64±1
 
84±2
 
120+8-4
 
1003612
φ64-4
 
64±1
 
90±2
 
120+8-4
 
10081216
Φ76-2
 
76±1
 
94±2
 
130+8-5
 
1103612
Φ76-4
 
76±1
 
94±2
 
130+8-5
 
11081216
Φ89-2
 
89±1
 
109±2
 
140+8-5
 
1303612
Φ102-2
 
89±1
 
122±2
 
150+8-5
 
1503612
Packages

Contacting us to get a quotation. 