Gbr-Be1940 19X40W RGBW LED B-Eye Zoom Moving Head Light

Min.Order: 10
Product origin: Guangzhou, Guangdong, China
Infringement complaint: complaintComplaint
US$ 650 ~ 695

Description

GBR-BE1940 19X40W RGBW LED B-EYE Zoom Moving Head Light

Specifcation:
Input Voltage:AC110-240V, 50/60Hz
Light Source:19pcs 40W RGBW 4in1 color LED
Power Consumption:800W
Life Span:50,000 Hours 
Color/CTO :RGBW Color Mixing/ 2500-8000K 
Zoom Angle: 4-60° 
Movement: Pan 540°, Tilt 250°, Smooth, fast and precise PAN/TILT movement
LENS: Unique Design for front Lens Bi-directional Endless Rotation 
Dimmer: 0-100% Dimmer
Strobe: 0-25HZ Strobe
DMX Channel: 23/35/101CH
Control : DMX 512 , Master/Slave, Auto, Sound Activated 
Other Functions: Adjustable Pan & Tilt speed, Automatic Error Correction; Compact and unique honeycomb design; Each LED could be controlled individual; Wash, Beam , FX (Kaleido Effects) effect; Digital wash-beam framing effect; Beam edge softening control (in wash mode)
Packing Size:53x42x51cm
N.W: 15Kgs                                        
G.W: 17kgs 


Product Image:


Effect:



RFQ:

Q1. Are you a factory or trading company?
A: We are the factory with more than 19 years in stage lighting production, Location at Baiyun District, Guangzhou , China. Welcome to visit our factory if you come to Guangzhou.

Q2. Can I have a sample order for the fixtures?
A: Yes, we welcome samle order to test and check quality, mixed samples are acceptable.

Q3. What about the lead time?
A: Sample usually needs 3-7 days, depending on the material delivery, mass production time needs 1-2 weeks for order quantity.

Q4. Do you have any MOQ limit for order
A: Low MOQ, 1pc for sample checking is available

Q5. How do you ship the goods and how long does it take to arrive?
A: For small order, usually ship by DHL, UPS, FedEx or TNT. It usually takes 4-7 days to arrive. Airline and sea shipping also optional. Mass order will suggest ship by sea to save the shipping cost.

Q6. How about the payment ?
A: 30% downpayment and  the rest paid before shipment , usually via Western union, Moneygram, T/T etc.

Q7.  How to proceed an order ?
A: Firstly let us know your requirements or application.Secondly We quote according to your requirements or our suggestions.Thirdly customer confirms the order and send out the deposit. Fourthly we arrange the production after downpayment get.  Fifthly,  Get the full payment and send out the goods.

Q8. Is it OK to print my logo on  product?
A: Yes. Print fee will be according to the logo type,  Please inform us formally before our production and confirm the design.

Q9.  Do you offer guarantee for the products?
A: Yes, usually for 1 years warranty to our products.

Q10: How to deal with the product problem?
A: Firstly, take the pictures and videos to us to check
  Secondly, we will tell you how to find out the key problem
  Thirdly, send the spare parts for you to fix


Company Overview:


Exhibition:

Scroll to Top