Automatic Cosmetic Use Makeup Cotton Pads Making Machine

Min.Order: 1
Product origin: Dongguan, Guangdong, China
Infringement complaint: complaintComplaint
US$ 26000 ~ 28000

Description

Popular Washable Cotton Remover Makeup Pads Machine Reusable 100% Cotton Pads Machine

1.Product shape can be customized according to customer needs, and one machine can be
   applied to a variety of molds.
2.Reserved the position of ultrasonic welding method, then the material has high versatility.
3.Automatically collect materials into rolls, and PLC control canset the number of each stack
   by itself.

 

       It is an automated machine. From the raw material apply to finished products cutting and
output at one time. It can produce non-woven make-up cotton, facial mask, insoles, mop cloth,
and also can make the non-woven cleaning gloves, only the mould has to be changed.

 

Machine Size5220*1230*1690 mm
Output500-600 pcs/min
Voltage220 V
Power9 KW
Pressure0.6 Mpa
Fuselage materialAluminium alloy
Special requirementSupport custom shapes and sizes
 






1)    Provide 24-hour service hotline.

2)    Reply and find out solution within the shortest time according to customer's requirement.

3)    Provide on call service to help customer solve problems.

4)    Provide free of machine installation as well as commissioning, and inform customer how to
       do the machine maintenance.

5)    Prepare customer's feedback tracking within one week after machine installation until meet
       customer's satisfaction.

6)    Provide one year guaranty and lifetime maintenance.



 

1.     Q: How is the after sales service?

      A: We provide 1 year guaranty and technical support lifetime. All machine's parts can be
            replaced for free within 1 year if broken(excluding error operation).

 

2.     Q: Is it difficult to install the machine?

      A: The work shop should prepare full facility such as power and air compressor. For the first
             installation, engineer will be sent to set machine and do the machine training as long as
             manual instruction. For the further problems come out, we can provide video instruction
             as well.

 

3.     Q: What's the machine lead time?

        A: For the standard machines, we can delivery within 30 days. If it is customized by customer
            (OEM), the lead time is 35-55 days.

Product Tag:
Related categories:
Scroll to Top