Description
Product Description
Double line T-shirt bag nylon bag bag making Machine
Adventage of machine
1.Fully automatic loading .auto lock roller whtn film is ready .
Auto stop machine when roller is damage or finished
2.Speed :350*2pcs/min .
3.with butter frame to make sure film is even and high speed
4.removable sealing part ,the bags will not thick together
5.PLC control
6.Inovance servo motor and inverter
Product Parameters
Specification:
Model | XPHQ-400X2 | XPHQ-500X2 |
Max. Bag-making width | 380mmX2 | 480mmX2 |
Max.Bag-making length | 650mm |
Bag-making thickness | 0.01-0.05mm |
Machine speed | 380pcs/minX2 |
Available Bag-making speed | 350pcs/minX2 |
Air pressure | 7kg/cm2 | 7kg/cm2 |
Total Power | 12kw | 15kw |
Weight of machine | 2000kg | 2500kg |
Overall dimensions | 6.5*1.5*1.6m | 6.5*1.6*1.6m |
Detailed Photos
Other product recommendation
workshop picture
Group picture with customer
customer feedback
Packaging & Shipping
FAQ
FAQ
1.:Are you factory or trading company ?
we are factory specialized in plastic machine for many years ,all of our engineer with more than 20 years experience .
2. Where is your factory? How can i visit your company?
our factory is located in Ruian city,zhejiang province, China.
Its about 40 minutes from shanghai by plane(4 hours by train).we will pick you up on airport or station .welcome to visit our factory
3 How long is your delivery time?
On normal our delivery time is 30-45 days .if you need it ugently ,we can make your machine first.about 10 days
4.:What's your warranty policy?
18 month guarantee and whole life maintance ,
5:What package do you use for the product?
Be Coated with anti-corrosion oil, and covered with plastic film, wooden box package need extra cost .
6:Does your factory provide installation service?
Our engineer can go to customer factory to installation . buyer should prepare materials used to testing the machine in advance and should be responsible for the cost of supplier's technician, including round air tickets, visa cost, accommodation and salary 100USD/Day per person since the day start out until the day arriving at factory.
7:What are your terms of payment?
We accept T/T, L/C. western union.
8. How could we do if the parts broken within warranty?
A: We would express the free replacement parts during the warranty date.
9: Does your engineer understand English?
A: Our engineer understand a little English. All our engineer have more than five years machine installation experience. In addition, they can use body language to communicate with customer.