Hnarl Genie Boom Lift Parts 89862 89862gt Valve Solenoid 2POS 3way Z45 Jib Valve

Min.Order: 1
Product origin: Changsha, Hunan, China
Infringement complaint: complaintComplaint
US$ 128.6 ~ 129.9

Description
HNARL Genie Boom Lift Parts 89862 89862GT Valve Solenoid 2POS 3WAY Z45 Jib Valve
 
Products Description
POWER UNIT ASSY-HYDR MOD
Parts No:
89862GT
Used for GENIE BOOM LIFT MODELS:
S60 S65 S60X S60XC S60TRAX.....
Packing Specifications:
Length (mm)
130
Width (mm)
50
Height (mm)
50
Weight (kg)
0.4
Description:
 
VALVE-SOLENOID,2POS 3WAY,JIB
A solenoid-operated, 3 port, direct-acting, spool-type, screw in hydraulic directional valve
 
Operation:
When de-energized, the valves allows flow from port 2 to port 1, while blocking flow at port 3. When energized, the cartridge's
spool shifts to open from port 1 to port 3, while blocking flow at port 2

 
Features
* Continuous-duty rated coil.
* Hardened precision spool and cage for long life.
* Optional coil voltages and terminations.
* Efficient wet-armature construction.
* Cartridges are voltage interchangeable.
* All ports may be fully pressurized.
* Unitized, molded coil design.
* Optional waterproof ECoils rated up to IP69K.
* Compact size.




 
Product Delivery
Shipping Time
Start & End
Descriptions
By Express.
DHL, FedEx, UPS, TNT, EMS, ARAMEX, ect
3-8 working days
Door to Door
For Small order, Sample order, Trial order
Fast & Convenient
Air Transportation
By Plane
5-10 working days
Door to Airport
For Medium order
Fast & Cheaper than express
The consignee needs to take delivery at the airport
Sea Transportation
By Vessel
20-45 days
Door to Seaport
For Mass order
Cheap but take time
The consignee needs to take delivery at the seaport
FAQ
Q1: How can I place order?
A: You can contact us by email about your order details, or place order on line.

Q2: How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Paypal, Western Union are the most usual ways we are using.

Q3: What's the order procedure?
A: First we discuss order details, production details by email or TM.
Then we issue you an PI for your confirmation. You will be requested to do pre-paid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15 days if we don't have the items in stock. Before production has been finished, we will contact you for
shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.

Q4: How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.

Q5: How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure
 
Q6. How does your factory do regarding quality control?
A: Quality is priority. We always attach great importance to quality controlling from raw material to the very end product. Our factory has gained CE and ISO 13485 authentication.
Scroll to Top