Professional Vegetable Processing Peeling Equipment Carrot White Radish Lotus Root Towel Ground Peeler Peeling Machine

Min.Order: 1
Product origin: Zhengzhou, Henan, China
Infringement complaint: complaintComplaint
US$ 3600 ~ 3885

Description

Professional Vegetable Processing Peeling Equipment Carrot White Radish Lotus Root Towel Ground Peeler Peeling Machine 

Product Description

The melon and fruit peeler can be used for cutting small melons and fruits such as carrots, white radish, potatoes, taro, and cucumbers. Simple operation, convenient cleaning, safe and hygienic. It is suitable for fruit and vegetable processing plant equipment, frozen food plant equipment, snack food plant equipment, large kitchen, catering industry, etc.

Parameter
 
Model HL-HLB
Dimension1980*510*1060mm
Power0.75KW
Voltage
 
220V
Weight180kg
Capacity 1500-1800PCS/hour 
MaterialStainless steel
Suitable for peeling foodcarrot
Detailed Image
Related Machine:
1.Carrot Cutter

2.Melon Peeling Machine

3.Apple pear peeling cutting machine

Packing and shipping
PACKAGE: Standard export carton packing
DELIVER TIME: 3-20 days after confiming ording,detail delivery date should be decided according to production and order quantity

FAQ
1) When can I get the price?

We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in
your email so that we will regard your inquiry priority.


2) How do you make your price?

We make the price according to our comprehensive costing. And our price will lower than the trade company because we are
manufacture.You will get competitive price and better quality.


3) Can you guarantee your quality?

Of course. We are the manufacture factory. More important, we put a high value on our reputation. Best quality is our principle
all the time. You can be assured on our production completely.


4) How long does the whole procedure being worked out?

After you place a order,the production handling time is about 30-45 days. We need 7 days to prepare all the stuff then 30 days for
manufacturing.


5) What about the transportation and delivery date?

Normally we use shipment to transport the goods.It is about 25-40 days.It also depends on which country and port you are. If there
are some emergencies we can send the goods via air express, as long as you afford the traffic expense.


Any questions pls contsct me freely!
Product Tag:
Related categories:
Scroll to Top