Inveter Welding Machine For Auto Part Industry

Min.Order: 1
Product origin: Guangzhou, Guangdong, China
Infringement complaint: complaintComplaint
US$ 24200

Description
 Welding Machine for auto part industry

Company Profile

 


Heron own over 56,000 square meters property; developed MFDC welding system, Capacitor discharge welding system, three-phase DC welding system; single phase AC welding system; offer a complete range of standard resistance welding equipments; and customize automation resistance welding production system with fixture; pursue high welding technology researching and developing all the time.
 
Company Brief
Founded in 1997.
Registered capital is 48 million RMB , about 350 employees
R&D on a wide range of Resistance Welding Machines and Production Lines.
Continuous Innovation.
Green Manufacturing.
 
With ISO9001, CCC, CE certification.
Products applying to----
 Automobile and Auto Parts Manufacturing Industry,
 Motor and Generator Manufacturer Industry,
 Low-Voltage Electrical Industry,
 Compressor Manufacturing Industry,
 Home Appliance and Hardware Industry,
 BTM Tog-L-Loc system and so on.


Packaging & Shipping

FAQ

FAQ

  1. Q   Are you a trading company or a factory?
    A   We are a manufacturing factory,.
  2. Q  Where is your factory located?
    A  Our factory is located in Conghua district, Guangzhou of China.
  3. Q  Can you customize the machine?
    A  We can customize the machine according to your requirements.
  4. Q  What is the MOQ?
    A  According to the customer's requirements.
  5. Q  What are your services during the purchase process?
    A  Pre-sales: Visit the factory, Technical solutions and program design services, Proofing services, Sample testing services.
        On-sales: Technical training, Installation and commissioning services.
      After-sales: Free non-wearable parts, Repair service, Video technical support, Online remote guidance.
  6. Q  How long is your warranty period?
     A  A: For one year after customer received the machine. (It's not including the comsumables)
  7. Q  What is the payment terms?
    A  We ship with full payment, and we can negotiate payment terms.( a. T/T 30% as deposit, 70% should be paid before delivery.b. L/C at sight)
  8. Q  How long is the delivery time?
    A  Delivery time for standard machines: 25 working days;
     Delivery time for customized machines: According to the degree of customization, about 1-3 months  after received 30% deposit.
  9. Q  Can you provide samples?
    A  We provide sampling service, but you need to send us the sample by courier
  10. Q  What's the trade terms?
     A  FOB, EX-Work
  11. Q  What's the package way?
     A  Wooden case
  12. Q  Which shipment port can you ship the goods?
    A  Huangpu port in Guangzhou

Product Tag:
Related categories:
Scroll to Top