Description
Product overviewTAG-8000 HV phase tester, used in power lines, phase tests and phase sequence tests for substations, with functions of phase testing, phase sequence testing, electrical inspection .with strong anti-interference, in line with (EMC) standards, adapt to a variety of electromagnetic interference occasions. High voltage phase signal will be taken out by the collector, discharge directly after treatment. Received by instrument and compare the phase, and identify the results. This product use wireless transmission technology, safe, reliable, fast and accurate.Products features1 Measurement voltage: 10-110kV (according customer order).
2 Accuracy: self-calibration error≤±3°
3 Sampling speed: 10 times/S.
4 Time setting: Easy for users to browse, view historical data.
5 Backlight time settings: on, off, set within 0-999 seconds.
6 Automatic shutdown settings: Never, within 0-999 minutes setting.
7 In-phase: ≤20°is in-phase, (phase threshold within 0-900, system default value is 20).
8 Out-phase: >20°is out-phase, (phase threshold within 0-900, system default value is 20).
9 Field calibration function: field calibration for measured lead to ensure the accuracy of the phase angle.
10 Handset detectors and X, Y detectors transmission distance: X≤150m, Y≤150m.
11 Multi-mode design, applicability, safer, and more convenient.
12 Unique interactive interface, simple operation
13 FCC antenna design, signal stronger, easier to penetrate walls , doors or obstacles blocking
14 Double shielding, strong anti-interference, in full compliance with EMC standards.
15 Charts and data display, easier to read.
16 Qualitative measurement: sound and light signal display.
17 Quantitative measurements: real-time display of phase angle difference, error≤5°
18 Phase sequence check: Shun phase sequence, reverse phase sequence (120, 240°)
Common problem1. Is your company a sales company or a manufacturer?
Wuhan UHV Power Technology Co.,Ltd. is an industrial and trade enterprise, with its own factory, self-produced and self-sold. We were founded in 2004 and have fifteen years of production experience. Our company has reliable production lines, test rooms and R&D centers.
2. Whether the goods are in stock, whether they can be customized, and how long the delivery time is.
After the goods have been ordered, it takes about 7 working days for production if there are no accidents.
3. Is the quality guaranteed?
In order to ensure quality, we use imported components in large quantities. After three times of quality inspection, the goods can be sent out, and the export is uniformly packed in non-fumigation wooden boxes.
4. What are the after-sales terms?
We offer free consulting service, one year warranty, and adopt various methods such as email communication, video calls, technology door-to-door, aiming to solve any after-sales problems in a timely manner.
5. What are the cooperative countries or regions?
Products have been successfully exported to the United States, Brazil, Australia, Russia, the Netherlands, Indonesia, Bangladesh, Iran, India, Saudi Arabia, Mongolia, Japan and other countries and regions. In the United States, India, Vietnam and other regions have cooperative distributors, can provide thoughtful services.Contact usWuhan UHV Power Technology Co.,Ltd.
Address:Building 6, Optics Valley Optical-Mechanical Industrial Park, No.83, Gaoxin 5th Road,
East Lake High-tech Zone, Wuhan city .China 430223