Customized Plate Metal Bracket Part Stainless Metal Enclosure

Min.Order: 1
Product origin: Shanghai, China
Infringement complaint: complaintComplaint
US$ 0.1 ~ 2

Description
Product Parameter's 
 
1Material1. Stainless steel: SS201, SS303, SS304, SS316, etc.
2.Carbon steel: AISI 1045, 9SMnPb28, Q235, 45 #, 20 #, etc
3.Brass: C36000 (C26800), C37700 (HPb59), C38500 (HPb58), C27200 (CuZn37), C28000 (CuZn40), etc.
4.Bronze: C51000, C52100, C54400, etc.
5. Iron: grey cast iron and nodular cast iron
6. Aluminum: 6061, 6063, 6082, 7075, 5052, etc.
7.Plastics: PEEK, POM, nylon, ABS... etc.
8.Titanium: TC4
2ApplicationIndustry Automobile Manufacturing, Automation Equipment, Electric & Power Industry, Solar & Wind Energy Equipment Accessories parts manufacture Agriculture Equipment Accessories,  Medical Equipment, Construction Machinery, Rail Transit, Communication Industry, Consumer Electronics Industry, Instrument Manufacturing, Energy Saving, and Environmental Protection Industry, Machine Tool Industry, Safety and Fire Protection Industry, Pneumatic Industry, Motor Industry, Automation Equipment Industry, Industrial Robot Industry, Textile Industry, Furniture, Semiconductor Industry, Transportation Products Industry, Bicycle Accessories, etc.
3AccuracyAccuracy Of Machining:+/-0.01mm
Accuracy Of Grinding:+/-0.005mm
Surface Roughness: Ra0.8
Parallelism:+/-0.01mm
Verticality:+/-0.01mm
Concentricity:0.01mm
4 Surface treatment Gold / Silver /Tin / Nickel / Zinc /  Chromium / Copper-plating /  Laser etching/Screen printing/Phosphating (can pass salt spray testing with 160 hours)/Black coating / Painting/ Power coating /Electrophoresis /  Passivating /Deburring /  Polishing /  Brush according to ROHS standard;
5Drawing Formatjpg/.pdf/.dxf/.dwg/.igs./.stp/x_t. etc
6 Quotation Please provide the Formal drawings (normally, with DWG/STP/PDF file ), and make notes with material/QTY/surface treatment and any other requirements, we will provide you the quotation sheet within 48-72 hours;
 
7Prototype & MouldWe make the prototypes or molds according to the drawings confirmed by both of us and the customers! The lead time depends on the structure and qty of parts, Normally, the lead time for prototypes is 3-15 days; the lead time for mold is 10-25 days;
 
8 ProductionWe will provide samples according to the drawings to customers for approval. Then arrange the production and confirm the delivery date according to the Purchase Order; Normally, the lead time for production is 5-30 days, the structure of parts is different, and the lead time will be different.
 
9Package 
 
Plastic bags; Preserving Box; Reel/tape package; Plastic tray; Wood box; Export carton and any other customized package according to the customers' requests.
 
10
 
Our AdvantagesReliable Quality
Competitive Price
High precision, high quality,  high accuracy continuous
Continuous Improvement
Defect-Free Products
On-Time Delivery
Customer Satisfaction
 Excellent After-Sales Service

 


Product Tag:
Related categories:
Scroll to Top