Welded Carbon Seamless Steel Tube Sch40 Sch60 Sch80 Square Hot DIP Galvanized Steel Pipe

Min.Order: 1
Product origin: Xi'an, Shaanxi, China
Infringement complaint: complaintComplaint
US$ 1385 ~ 1400

Description


Product name: Hot Rolled Carbon Steel Seamless Pipe Sch60

Welded Carbon Seamless Steel Tube Sch40 Sch60 SCH80 Square Hot Dip Galvanized Steel Pipe

Product Name:
Hot Dipped Galvanized Steel Pipe
 
 
Size:
OD
8-219mm
Thickness
0.1~12mm
Length
6M12M And Other Length Can Be Provided
Steel material:
Q195, Q215, Q235, Q345(Chinese Standard, Other Material Can Also Be Provided)
Standard:
BS 1387.GB 3091 ASTM A53 JIS G3444, DIN2444
Usage:
Used For Gas, Oil, Water Pipes, Structure, Mechanical
Ends:
Plain Or Threaded With Socket Or Beveled With Plastic Caps
Surface:
Galvanized, color painted
Zinc Coated:
Pre galvanized: 60-150g/m2
Galvanized: 200-400g/m2
Package:
In Bags, Bundles, Losses Containers Or Any Other Seaworthy Package As Client Option,
inspection:
With Hydraulic Testing, Eddy Current, Infrared Test
Technique:
ERW and Hot Rolled/Cold Rolled/ Cold Drawn
Type:
Welded/Seamless
Payment:
LIC TIT
Delivery:
Within 10-15 days if pipe in stock, Within 20-30 days if pipe need to be produced

 

Tests we apply to the tubes:

1. Chemical composition analysis

2. Mechanical properties (tensile strength, yield strength, elongation, hardness)

3. Technological test (flattening test, flaring test, bending test, hydraulic pressure test)

4. Surface quality detection

5. Eddy-current examination

6. Visual test

Applications:

1. Low and middle pressure fluid transportation pipeline

2. Casing pipe

3. Low and medium pressure boiler seamless steel pipe

4. High pressure boiler seamless steel pipe

5. Carbon seamless steel pipe for ship

6. Seamless steel pipe used in high pressure chemical fertilizer equipment

7. Petroleum and natural gas industry

8. Steel pipe for heat exchanger

9. Used for diesel engine

10. Chemical industry, building industry, environment industry and more

Delivery condition: hot rolled, annealed, normalized, quenched and tempered

Packaging:

1. Bundle packing

2. Beveled end or plain end or varnished as per buyer's required

3. Marking: as per customer's requests

4. Painting varnish coating on the pipe

5. Plastic caps at ends

Delivery lead-time: with 15-30 days after full payment received

Our services: third party inspection accepted such as SGS, BV

Product Tag:
Related categories:
Scroll to Top