2023 Sanxing New Type Fire Fighting Equipment Foam Fire Sprinkler

Min.Order: 800
Product origin: Quanzhou, Fujian, China
Infringement complaint: complaintComplaint
US$ 0.6 ~ 2.5

Description
Supplier's popular products
 
 
Product Description
 
 
1. Fire Sprinkler is an important part of wet-type auto spraying system. It is usually installed inside the building and structures with light fire danger, medium fire danger and heavy fire danger, such as workshop, warehouse, hotel, shop, recreational place, hospital, cinema, office building and garage. 
2.The sprinkler consists of sprinkler frame, sealant and glass bulb. It is to be installed in the protective district via ductwork, acting as a fire detector and auto sprayer.
3. In case of fire inside the protective district, the atmosphere temperature rises up and the liquid inside the glass bulb expands after being heated and explodes after reaching the operating temperature of the glass ball. The sealant drops and the sprinkler sprays to the protective district for fire extinguishments subject to the preset shape of spraying.

 
Product Parameters

 

 TypeModelNominal Diameter(mm)Connecting ThreadFactor(K)Bulb
Conventional  T-ZSTPDN15 DN203mm
R1/2
5mm
R3/4
801153mm 5mm
PendentT-ZSTX
UprightT-ZSTZ
SidewallT-ZSTBS
ConcealedZSTDY
 
NumberNominal operating temperature (ºC)Color scale
157orange
268red
379yellow
493green
5107green
6121blue
7141blue
8163purple
9182purple
10204black
11227black
12260black
13343black
 
Detailed Photos



 

 
Company Profile

 




Successful Cases

 
FAQ

Choosing us is the right decision!

1. Are you a factory or trading company?
   We are a professional manufacturer. We warmly welcome clients from worldwide to visit our factory
   and cooperate with us. We can offer OEM & ODM service.


2.
 Can you produce goods with special specification ?
  Our company focuses on customized products. First of all, we need to know the specification in details,  and then we need to check with our technology department. We will give customers satisfying reply as soon as possible.

3.  How long is the delivery time?
   30-45 days after the advance payment.

4.
 What's your advantage?
   Independent R&D team, professional production and sales team, great production capacity sustainable    supply. Use the best material and production process. Low defective rate.


5. How can we guarantee quality?
  Always a pre-production sample before mass production;
  Always final Inspection before shipment;


 
Scroll to Top