Runner Type:Hot Runner
Hot Runner Brand:Hasco,Yudo,Mold-Masters,Chinese etc
Design Software:UG,PROE,CAD,CATIA,SOLIDWORKS
Heat Treatment:Nitriding
Mould design: 7days
Our target:Save every pennny for client
Quality control: Professional QC
Machine Equipment:CNC,EDM,Wire cutting machine,Drilling machine
Mould running: Full automaticity
Mould steel:S136,NAK80,AISIP20,DIN1.2311(P20),DIN1.2344, DIN1.2738,H13,718H,2316 etc.For
your choice.
Plastic material
PP, PC, PS, PE,PVC, ABS, PMMA,TPE ect.
1.Offer you mould core & cavity steel certificate
2.Offer you mould trial video
3.Mould process report
Weekly report, mould trial video and samples for your checking
4.Spare parts
wearing spare parts provided
FAQ:
1.How about your quality control?
We have professional QC team to control mold quality from raw material,machining to the final mould testing parts,as we realize that quality control is the first priority to run business successfully,and the Quality is the life of enterprise.
2.What's your lead time?
For most mold,normally 45 to 60 working days ( not including Chinese official holidays ) after deposit received and mold drawings approved.
3.How to approval samples?
1) You can come to our factory to see the mold testing directly.
2) We could send samples by DHL, TNT, Fedex, and we can send mold running video and molding parts dimension inspection report to you by email.
4.What about your after service?
1 year under normal use procedure,Spare part which is non-man made damaged will be offered for free within one year, and you can contact us at any time if you need help.