Productive Technology | High Preressure Die Casting, Low Pressure Die Casting, CNC, Surface Treatment, Heat Treatment |
Material | Zinc alloy (Zamak#3/ Zamak#5 / Zamak#7) |
Aluminum Alloy (ADC12,A380, AISI12,ADC10,A383,A390) | |
Brass, Bronze, Copper, etc | |
Casting facility | 150T-3000T |
Machining facility | CNC,NC lathe,ordinary machine tools,linear cutting machine, NC milling machine, polishing machine |
Surface Treatment | Sand Blasting, Bead Blasting, Polishing, Brushed Polishing, Powder Coating, Galvanized Plating |
Heat treatment | Normalizing/Quenching/Tempering. |
Casting Tolerance | CT4- CT6 Or machining according to request |
Machining tolerance | +/- 0.005mm,ISO2768-f |
Dimensions | <=1500mm |
Unit weight | 5g-30kg |
1.How can I get the quotation?
Please give us your drawing,quantity,weight and material of the product.
2.If you don't have the drawing,can you make drawing for me?
Yes,we are able to make the drawing of your sample duplicate the sample.
3.When can I get the sample and your main order time?
Sample time: 35-40 days after start to make mold. Order time: 35-40 days, the accurate time depends on product.
4.What is your payment method?
Tooling:100% T/T advanced Order time:50% deposit,50%to be paid before shipment.
5.Which kind of file format you can read?
PDF, IGS, DWG, STEP, MAX
6.What is your surface treatment?
Including: powder coating, sand blasting, painting, polishing, acid pickling, anodizing, enamel, zinc plating, hot-dip galvanizing, electrophoresis, chrome plating.
7.What is your way of packing?
Normally we pack goods according to customers' requirements.