Electric Course Dachi Iron Rack 3100*1200*1900 China Golf Cart DC-G-B4

Min.Order: 1
Product origin: Shanghai, China
Infringement complaint: complaintComplaint
US$ 3300 ~ 4000

Description
 
 
PowerELECTRIC/HP ELECTRIC AC
MotorAC48V 5KW
Horsepower6.8HP
BatteriesEight (8) 6V flooded lead acid (optional lithium available)
ChargerOnboard, automatic 48V DC,20 amp, AC100-240V
Max Speed20km/HR- 40km/HR
Steeri ngSelf-adjusting rack & pinion
Front SuspensionMacPherson independent suspension
BrakesFour-wheel hydraulic disc brakes
Park BrakeElectromagnetic brake
Body Finishautomotive paint/clearcoat
Tires205/50-10 or 215/35-12
Wheel size10inch or 12inch
Ground Clearanee10cm-15cm
DachiAuto Group has 6 large factories located in Shandong, Tianjin, and Jiangsu. The group specializes in the research, development, production, and sales of high-end electric tricycles, low-speed new energy vehicles, and special vehicles. Its product portfolio includes low-speed electric vehicles, low-speed field cars, golf carts, sightseeing cars, recreational vehicles, electric bicycles, electric motorcycles, trolley tricycles, energy storage power supplies, and more. The earliest-established company within the group, Shandong Bus New Energy Vehicle Industry Co., Ltd., was founded in 2008. The total factory area spans 1209 acres, with a total construction area of 470,000 square meters. Each factory is equipped with 42 production lines and 2237 production equipment. The group employs 2489 staff members, including 207 R&D engineers with 8 holding graduate degrees, 119 holding undergraduate degrees, and 71 holding associate degrees.
Our factory
Our Exhibition
Packaging shipping
Certification
FAQ

Q1:Are you factory or trading company?
A:We are factory in Shandong province,China. Near Qingdao port.

Q2:What kind of certificate you have?
A:ISO9001 Certification, CE Certification. Manufacture license of special equipment and ERP Program Management.

Q3:Do you support customized products?
A:Sure, we can produce the customized products per your drawings and other requirements.

Q4:What is the lead time of the product?
A: Generally 7-15 days after getting the deposit.

Q5:How about the trading term and payment term?
A:We can discuss this individually.


 
Product Tag:
Related categories:
Scroll to Top