SGS Original Factory Prefabricated Multi-Layer Prefabricated Factory Steel Structure Building Steel Frame for Sales

Min.Order: 50
Product origin: Foshan, Guangdong, China
Infringement complaint: complaintComplaint
US$ 30 ~ 60

Description
Steel building construction has grown in popularity over the last few years due to its inexpensive cost, with costs now averaging around $100/square foot. Steel allows for greater flexibility and design opportunities when constructing buildings, because steel can be made into any shape or size that is needed. When compared to traditional construction methods, steel building construction offers incredible value and versatility for a range of applications

 
Drawing Views

 

Installation Instructions

 



 
Materials List

 

 
ComponentsSpecification
Embedded PartsAnchor BoltM24
High Strength BoltM20,10.9S
Common BoltM16
Galvanized BoltM12
Shear NailM16
Brace rodΦ32*2.5
Main Steel
structure parts
Steel column(Q355B)H300~600X220X6X10
Wind column(Q355B)H350X220X6X10
Roof frame beam(Q355B)H600~400X200X6X10
Door frame(Q235B)[18
Tir barΦ114*3.0
Column braceΦ114*310
Horizontal braceΦ22 Round bar
Angle brace L56*4.0
Roof purlin(Q235B)Z200X75X20X2.5
Wall purlin(Q235B)C180X60X20X2.2
Connecting panel (Q355B)6-20MM Steel panel
Other Steel structure partsElectric rolling door 4000X4000X2 PCS
Roof panel 0.6mm840# color steel panel  LGY/white gray
Translucent roofing panel3.0mm840# PC Translucent roofing panel
Wall panel 0.6mm900# color steel panel  LGY/white gray
Trimming 0.6mm Color steel panel
Color:IGR /Iron gray
Metal partsSupport,self-tapping screw,glass glue etc





 
Steel Building Benefits

 

  1. Low maintenance costs
  2. Environmentally friendly and recycling.
  3. Offer flexibility for fixing doors, windows, and interior partitions
  4. Steel structure construction is strong, durable, and stable.
  5. Steel components are resistant to termites and other destructive insects.
  6. The service life of steel structure buildings is more than 50 years.
  7. Fast construction, easy installation, and convenient to transport.


 
About LiYou Steel Structure

 

Guangdong LiYou Steel Structure Engineering Co., Ltd. is headquartered in the National High-tech Development Zone, Shishan Town, Nanhai District, Foshan City, and the factory is located in Baini Town, Sanshui District, Foshan City. The head office was established on September 28, 2014. It is a service enterprise integrating steel structure consulting, design, production, construction, and maintenance. Mainly engaged in steel structure prefabricated buildings, including portal steel frames, pipe trusses, box columns/beams, steel lattice columns, H-shaped steel, and other steel structure products.




 
Why Choose Us

 

01 Customized Design
Offer professional building planning & drawing, and suitable steel components according to your requirements.

02 Quality Assurance
  1. Strict quality control
  2. Safe packing
  3. Quality inspection before shipment

03 After-sales service
  1. Installation instruction on site
  2. Installation technical team backup
  3. Timely communication by Email & Phone
04 SGS Factory Certification 



Certification




 
Loading

 





 
FAQ

 



Q: What should you provide before the quotation?
A: Please send your design drawings, or sketches to us and tell us the materials you want to use. If you do not have the drawings, just inform us of more data about the steel building you need, like the building's total area, detail dimension, floor amount, roof load, wind load, etc. from all of your requests. If you can make a hand draft, that would be great and helpful for us to get your idea.

Q: What accessories do we provide for customized steel buildings?
A: Along with the wall and roof insulation systems, we also offer skylights, commercial-grade ventilation devices such as roof turbine vents and wall louver vents, rolling doors, and double sliding doors.

Q: Can the steel building be installed by yourself?
A: Certainly you can. The construction is a simple bolt-together process, which is easy if you have the needed access equipment. Every steel building we make comes with bolts, screws, downspouts, gutters, flashing, and clear instructions as to show you where everything is to be installed. And we will provide the installation drawing to you for reference.


Q: What should be prepared for the site before installation?
A: You will need concrete piers for the columns to sit upon. Most people pour a full foundation, but if your steel building is on a farm or ranch and there will be dirt, gravel, or sawdust on floors, a pier system may be preferable. In these situations, the popular option is to combine piers with a concrete footing around the perimeter of the building.

Q: Do we have a recommended foundation and associated drawing?
A: Yes, we will provide the foundation drawing and the installation drawing for you after shipment. But the foundation drawing is just for reference because the land and the soil are different in different countries.



Product Tag:
Related categories:
Scroll to Top