A chemical shower system is a key device for positive pressure protective suit type bio-safety laboratories. Its main function is to disinfect the surface of the positive pressure protective suit by spraying chemical agents, to prevent the spread of bio-contamination. It is usually arranged between the contaminated area and the semi-contaminated area, as an important barrier for the personnel to safely exit the protective area and avoid the leakage of bio-hazardous substances.
Model | BS-03-CS-1 |
Installtion method | Flush with the wall panel |
Airtight method | Double seal ring inflatable barrier |
Control mode | Siemens PLC |
Communication mode | RS232 RS485 TCP/IP |
Compressive strength | ≥2500PA |
Corrosion resistance | H2O2 sterilization, formaldehyde sterilization, disinfectant |
Internal environment | Negative pressure |
Work environment | -30ºC+50ºC |
shower method | Automatic Sprinkler, forced water supply |
Switching time | Inflatable≤5s Deflation≤5s |
Open mode | HMI Human Machone Interface /Physical Byttons |
Locking method | Electromagnetic lock interlock |
Doorframe material | 304/316 |
Door leaf material | 304/316 |
Sealing strip material | Silicon rubber |
Inlet medium | Compresssed air |
Inflation pressure | ≥0.25MPa |
Action mode | The electromagnetic valve |
Pressure interface gauge | RC1/8 |
Temperature and humidity detection | 0-80ºC,0-100%RH |
Power Supply | 220V 50Hz |
Net weight | 200KG |
Door closer | DORMA |
Window | Round tempered glass |
Door handle | ¢25mm U-shaped |
Shower | Atomizing nozzle+Shower head |
Water supply device | Boost cycle |
Poit lamp | Red closed state,green passage |
Disinfection device | Dosing system mixing |
Living system | Yes |
Escape device | Yes |
Pressure monitoring | Yes |
Purification function | Yes |
Drainage device | Anti-backflow floor drain |
Purification filter | HEPA H14 |
Error alarm | Low pressure<0.15MPa |
BMS system | Accessible |
Authority management | Level 3 permissions |
Inspection report | Verifiction Report of the Third Party (National Inspection Center) |
Validation Documentation | 3Q documents |
Customized services | Yes |
After-sales service | Yes |
Installation Services | Additional quotations are required for different regions and countries |