Custom Metal Parts CNC Machining Machined Parts CNC Milling Parts for Wire Drawing Machine

Min.Order: 1
Product origin: Shanghai, China
Infringement complaint: complaintComplaint
US$ 0.1 ~ 100

Description
What are the common processing technologies for automobile sheet metal parts?
1) Curling.
Automotive sheet metal parts usually contain sharp edges with "hair" after initial production. Crimping is a forming process that involves deburring a metal plate to produce a smooth edge
2) Bend.
Another common forming process of automobile sheet metal parts is bending. Companies usually use brake press or similar machine presse to bend automobile sheet metal parts.
3) Ironing.
It is also possible to charge metal plates to achieve uniform thickness. For example, most hat mirrors are made of iron. In the original state, the aluminum plate is too thick for the beverage, so it needs to be ironed to obtain thinner and more uniform ingredients
4) Laser cutting.
In recent years, laser cutting has become a more and more common forming process for automotive sheet metal parts. Through laser cutting, the metal plate is exposed to a high-energy laser and burns holes in the metal.
5) Hydroforming.
A little-known forming process of automobile metal parts is hydraulic forming. Like deep drawing, hydraulic forming involves drawing wool on the mold. So what is the difference between hydroforming and deep drawing? The main difference between these two processes is that deep drawing needs to reduce drawing many times, while hydraulic forming can be completed in only one step.
6) Punching.
Stamping is a forming process of automobile sheet metal parts, which involves punching holes in automobile sheet metal parts with punches and dies. Automobile sheet metal parts are placed between punches and die, and then punches are pressed down and pass through metal plates to form a hole.


   

Product Description 

 
1Materials1. Stainless steel: SS201, SS303, SS304, SS316, etc.
2.Carbon steel: AISI 1045, 9SMnPb28, Q235, 45 #, 20 #, etc
3.Brass: C36000 (C26800), C37700 (HPb59), C38500 (HPb58), C27200 (CuZn37), C28000 (CuZn40), etc.
4.Bronze: C51000, C52100, C54400, etc.
5. Iron: grey cast iron and nodular cast iron
6. Aluminum: 6061, 6063, 6082, 7075, 5052, etc.
7.Plastics: PEEK, POM, nylon, ABS... etc.
8.Titanium: TC4
2ApplicationIndustry Automobile Manufacturing, Automation Equipment, Electric & Power Industry, Solar & Wind Energy Equipment Accessories parts manufacture Agriculture Equipment Accessories,  Medical Equipment, Construction Machinery, Rail Transit, Communication Industry, Consumer Electronics Industry, Instrument Manufacturing, Energy Saving, and Environmental Protection Industry, Machine Tool Industry, Safety and Fire Protection Industry, Pneumatic Industry, Motor Industry, Automation Equipment Industry, Industrial Robot Industry, Textile Industry, Furniture, Semiconductor Industry, Transportation Products Industry, Bicycle Accessories, etc.
3AccuracyAccuracy Of Machining:+/-0.01mm
Accuracy Of Grinding:+/-0.005mm
Surface Roughness: Ra0.8
Parallelism:+/-0.01mm
Verticality:+/-0.01mm
Concentricity:0.01mm
4 Surface treatment Gold / Silver /Tin / Nickel / Zinc /  Chromium / Copper-plating /  Laser etching/Screen printing/Phosphating (can pass salt spray testing with 160 hours)/Black coating / Painting/ Power coating /Electrophoresis /  Passivating /Deburring /  Polishing /  Brush according to ROHS standard;
5Drawing Formatjpg/.pdf/.dxf/.dwg/.igs./.stp/x_t. etc
6 Quotation Please provide the Formal drawings (normally, with DWG/STP/PDF file ), and make notes with material/QTY/surface treatment and any other requirements, we will provide you the quotation sheet within 48-72 hours;
 
7Prototype & MouldWe make the prototypes or molds according to the drawings confirmed by both of us and the customers! The lead time depends on the structure and qty of parts, Normally, the lead time for prototypes is 3-15 days; the lead time for mold is 10-25 days;
 
8 ProductionWe will provide samples according to the drawings to customers for approval. Then arrange the production and confirm the delivery date according to the Purchase Order; Normally, the lead time for production is 5-30 days, the structure of parts is different, and the lead time will be different.
 
9Package 
 
Plastic bags; Preserving Box; Reel/tape package; Plastic tray; Wood box; Export carton and any other customized package according to the customers' requests.
 
10
 
Our AdvantagesReliable Quality
Competitive Price
High precision, high quality,  high accuracy continuous
Continuous Improvement
Defect-Free Products
On-Time Delivery
Customer Satisfaction
 Excellent After-Sales Service

 

Product Tag:
Related categories:
Scroll to Top