Low Price Metal Carved Facade Laser Cut Decorative Moucharabieh Wall Panel for Building

Min.Order: 1
Product origin: Foshan, Guangdong, China
Infringement complaint: complaintComplaint
US$ 30 ~ 37

Description

Product Description
Product name
Aluminum curtain wall (visable frame, invisable frame, hidden frame)
 
Material
Aluminum alloy, glass
 
Surface trestment
Powder coating, Anodized, Electrophoresis, Fluorocarbon coating
 
Color
Matt black; white; ultra silver; clear anodized; nature clean
aluminium; Customized
 
Functions
Fixed, openable, energy saving, heat & sound insulation,
waterproof
 
Design and dimension
Custom made
 
Profiles
110, 120, 130, 140, 150, 160, 180 series
 


Glass option
1.Single glass: 4, 6, 8, 10, 12mm (Tempered Glass)
 
2.Double glass: 5mm+9/12/27A+5mm (Tempered Glass)
 
3.Laminated glass:5+0.38/0.76/1.52PVB+5 (Tempered Glass)
 
4.Insulated glass with argon gas (Tempered Glass)
 
5.Triple glass (Tempered Glass)
 
6.Low-e glass (Tempered Glass)
 
7.Tinted/Reflected/Frosted Glass (Tempered Glass)
 
Glass Curtain/Wall System
• Unitized Glass Curtain Wall
• Point Supported Curtain Wall
• Visible Frame Glass Curtain Wall
• Invisible Frame Glass Curtain Wall
 
Production standard
Basis on the shop drawings which approved by the buyer
 
Applications
Commercial, residential
 
123
 
Certifications

 

Our Customer

 

 

Packaging & Shipping
FAQ

1.Can I buy installation accessories from you?
Yes, we provide all installation accessories. If you want to know more about the installation of aluminum ceiling tiles, please contact with our professional sales team.


2.Can I put insulation material on the back?
Yes, in order to get better insulation performance, you can put insulation material on the back of ceiling or wall cladding.

3.Do you have stock in your warehouse?
For the panel, we don't have stock in the warehouse. We arrange production according to you order. Accessories have stock in the warehouse.

4.What's your production capacity and delivery time?
We have nearly 200 full time staff in the workshop, and we can finish about 5000sqm per week. Usually, production leading time is 7-10 days. Large quantity and complicated design will take more time.
Product Tag:
Related categories:
Scroll to Top