Cost-Efficient Expansive Concrete Pile Head Demolition Agent

Min.Order: 20
Product origin: Fuzhou, Fujian, China
Infringement complaint: complaintComplaint
US$ 7.8 ~ 8.2

Description
Components
 
PILE HEAD CUTTER("PHC")
NAMEAPPLICATIONPACKING
PHC(ES)Small cut pile headФ500mm-Ф800mm600×35mm×10pcs
PHC(S)Large cut pile headФ900mm-Ф1200mm700×45mm×10pcs
PHC(B)Large cut pile headФ1300mm or more550×70mm×10pcs
Bracket
NAMEACCESSORY
For PHC(ES)Bracket type ESBThe brackets are then fixed to the steel reinforcement cage,with the PHC at the level that the crack should form in the pile head
For PHC(S)Bracket type B
For PHC(B)Bracket type BB/DBB
De-bonding foam
NAMEREMARKS
De-bonding foam
for vertical reinforcement anchor bar
There are five sizes with a diameter of 16-40mm
 
 
  1.  PHC
                a) Type ES-35mmWx600mml
                b) Type S-45mmlWx700mml
                c) Type B-70mmWx550mml
  2.  Steel Reinforcement De-Bonding Covers
                Various sizes - From Φ16mm to Φ40mm
   3.  Steel Brackets
                a)Type ESB
                b) Type SB
                c) Type BB
                d) Type DBB
     4.   Plastic bag 
                a) 5C-W130mm-L1100mm
                b) 5C-W140mm-L1400mm

 
Installation Procedure

1.  The PHC materials are fixed to the steel Reinforcement cage prior to lowering the cage into the bored hole for concerting.
2.  The PHC are initially fitted to the steel brackets.
3.  The brackets are then fixed to the steel reinforcement cage,with the PHC at the level that the crack should form in the pile head.
4.  Install de-bonding covers to all the steel 
Reinforcement starter bars above the PHC.
5. 
The installation of the PHC is complete and ready to be installed into the bored hole for concreting.
 

 

Pile Head Removal

  1.  After concreting, wait 4 to 5 days for crack to form at the pile head.
  2. 
When the crack at pile head has formed, the pile head can be removed by lifting it off with crane, when necessary with the aid of an excavator.
 
CONFIGURATION OF PHC FOR EACH PILE SIZE

Q: Why choose our product?
A: Reduce labor costs, improve efficiency, save time, reduce noise, and be more environmentally friendly.

Q: Are you a manufacturer?
A: Yes,our factory was established in 2011 and we have our own trading company.

Q: What's the MOQ and payment terms?
A: MOQ is 20 pieces. Payment via T/T.

Q: How about delivery time?
A: 15-30 work days after the payment, and also depend on your quantity.

Q: How long is the shelf life of the product?
A:  In a dry environment  6-8 month.

Q: Which country have you exported?
A:  Most Southeast Asian countries.
Product Tag:
Related categories:
Scroll to Top