12V 250ah Lead Acid Solar Battery for The Solar Storage System

Min.Order: 1
Product origin: Wuxi, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 129 ~ 233

Description
 

DANGER OF EXPLODING BATTERIES
Batteries contain sulfuric acid and produce explosive mixtures of hydrogen and oxygen.Because self-discharge action generates hydrogen gas even when the battery is not in operation,make sure batteries are stored and worked on i a well-ventilated area.Always wear safety glasses and a face shield when working on or near batteries. When work- ing with batteries:
* Always wear proper eye, face, and hand protection. 
* Keep all sparks, flames, and cigarettes away from the battery. 
* Do not remove or damage vent caps. 
* Make sure work area is well ventilated.
* Never lean over battery while boosting, testing, or charging.


SAFE BATTERY INSTALLATION
To assure safe installation and proper operation,follow these installation procedures:
* Disconnect ground cable first (this is usually he negative cable;however, older vehicles may have a positive ground).
* Remove battery - note position of positive(+) and negative(-)terminals.Mark the cables for correct connection to replacement battery.
* Clean terminals and cable connections with a wire brush.Broken connections and frayed or cut cables should be replaced.
* Install the replacement battery in the same position as the old one. Secure battery with the holddown assembly.
* Make sure the terminals do not touch any metal mounting, engine, or body parts.
* Connect cables tightly. Connect ground cable last to avoid sparks.


SAFE CHARGING
Before beginning the charging operation, read the instructions that come with the charger. Never attempt to charge a battery without first reviewing the instructions for the charger being used. In addition to the charger manufacturer's instructions, these general precautions should be followed:
* Always charge batteries in a well-ventilated area and wear proper eye protection.
* Turn the charger and timer "OFF"before connecting the leads to the battery to avoid dangerous sparks. Never try to charge a visibly damaged or frozen battery.
* Connect the charger leads to the battery; red positive (+) lead to the positive(+) terminal and black negative (-) lead to the negative (-) terminal. If the battery is still in the vehicle, connect the negative lead to the engine block to serve as a ground. (If the vehicle is positive grounded, connect the positive lead to the engine block.)
* Make sure that the leads to the connections are tight.
* Set the timer, turn the charger on, and slowly increase the charging rate until the desired ampere value is reached..
* If the battery becomes hot or if violent gassing or spewing of electrolyte occurs, reduce the charging rate or temporarily discontinue the charge.

* Always turn the charger "OFF"before removing charger leads from the battery to avoid dangerous sparks.



MY SOLAR TECHNOLOGY CO., LTD.established in December 2010, is a member of MY Solar group, which is specializing in the desian, manufacture and sales of PV modules and correlative products.
Our management team is experienced and professional. Our core products - PV modules, are rational designed, excellent in workmanship, and have a stable performance, power range covers 3Wp-400Wp, are widely used in photovoltaic power stations, BIPV & BAPV, satellite communications, geological monitoring and
forest fire prevention, etc. Our products are exported to Europe, America, Asia- Pacific and Africa.
MY Solar is a core supplier of many key large projects in China, and is also a supplier of photovoitaic modules and correlative products which is selected, trusted and recommended by many professional designing institutes.
 
 Q:What's your payment terms?
A:T/T,L/C,Paypal,Western Union etc.

Q:What are the advantages of your company?
A:We are a factory, and we also cooperate with other brands,such as Longi,JA solar,Jinko,Trina,Canadian Solar,GCL,SUNTECH,Yingli etc., to provide customers with better prices and more choices.


Q:May I have a piece of sample to check the quality?
A:Welcome to place the testing order to check the quality or for testing.


Q:How about the delivery time?
A:15-20 days after receiving your payment.
The specific delivery time depends on the items and the order quantity.


Q:Where is the port of loading?
A:Shanghai,Ningbo.


Q:Can you do OEM?
A:Yes.
Product Tag:
Related categories:
Scroll to Top