1) Good Quality , Well and timely Service, Competitive Price
2) Certificate: CE Certificate
3) One Year Warranty, Long Life Service .
4) Tension Controller, EPC ,Ceramic Rollers,Doctor Blade.
5) Taiwan Motors, high precision.
6) Perfect after-sales service team to support.
7) Touch screen interface and motion control, easy and efficient.
Main parameter
Technical Specification | |
Model | DCWY-B81000 |
Standard Machine width | 600mm 800mm 1000mm 1200mm ... |
Material feeding width | 200-1600mm, also can customized for more width material |
Printing Width | 160-1560mm, also can customized for more width material |
Printing Length | Standard is 400mm,can customized from 300-1000mm |
Structure type | Stack type |
Material | Non-woven fabric, Paper, Film(PVC.PE.BOPP.PE), Aluminum foil, |
Thickness of plate | 1. 14mm 1.7mm 2.28mm 2.84mm 3.94mm can customized |
Printing length | 300-1000mm (customized by client) |
Printing speed | 100m/min |
Register precision | ±0.03mm |
Transmission drive type | Synchronous belt |
Gear | 1.5mm |
Heating | Electricity Heating |
Double tape thickness for stick plate | 0.38mm 0.5mm can customized |
Machine standard size | 600-1200mm. Also we can make 1500mm, 1800m,2000mm, 2400mm , 3200mm |
Offer your details, we will make machines only belongs to you.
Safe operation process of gravure printing machine
1. The captain is responsible for supervising the safety of machinery, equipment and crew members.
2. Before operation, the operators must wear work clothes and shoes neatly, fasten the skirt and cuffs, and do not put sundries in the pockets that are easy to fall out Do not wear watches and all kinds of accessories.
3. Before starting the machine, add the required lubricating oil (grease) to each oil filling point, lubricating point and oil tank of the machine.
4. Without approval, non crew members are not allowed to start and operate the machine without authorization. Assistants and apprentices should work under the guidance of the captain.
5. Before starting the machine, check whether there are sundries in all parts of the machine body. You must give a signal first, echo back and forth, and ensure the safety around the machine Power on.
6. Before the machine runs, count the weeks reversely and then count the weeks positively to avoid sundries between rolls damaging the blanket, printing plate, etc.
7. During the operation of the machine, it is strictly forbidden to touch the moving working surface with hands, repair and wipe the machine, cross the rotating parts, and maintain the machine The protective devices are complete.
8. The crew should strictly observe their posts according to the division of labor, pay attention to the operation of all parts of the machine at all times, and stop the machine immediately if any problems are found.
9. The working site should be kept clean and unblocked, and the ground. There should be no sundries around the workbench and machine, and the maintenance tools and spare parts should be placed in the specified position
10. During work, no one is allowed to laugh, fight or make noise around the machine.
11. At the end of the work, clean the machine, protect the printing plate, scrub the blanket, embossing cylinder and roller pillow, and turn off the power.
12. Regularly maintain and repair the machine.
Click picture below to view more similar Machines.
The applicable materials for printing are as follows:
1. Polyethylene, polyethylene plastic film printing
2. Bags (food packaging bags, supermarket handbags, vest bags, clothing bag printing)
3. Web and process paper printing
4. PP woven bag, PVC film, BOPP film, printing
5. Laminated bag roll printing
6. Non woven roller printing
7. PP woven printing of rice bags
8. Paper printing
It is a kind of ideal printing equipment for producing paper packing bag for food, supermarket handbag, vest bag and clothes bag, etc.
Note: some parts of the machine are designed differently for different printing materials. Please indicate the specific printing materials when querying.
Q1. How to install and operate the machine?
Due to the Global Epidemics we can not send the engineer , will provide the manual and installation video.
After the global epidemic end, The seller will send 1 engineer to install, test the production line and train customers' workers in buyers' factory. It will take 1 week for whole installation and training.
Q2. What should we charge for your engineer?
The buyer should cover engineers' salary, visa cost, round-trip air tickets, accommodations, transportation in buyers' country, food, medical care, safety cost, and related cost happens in buyers' country. Also, the buyer should prepare enough labor, electric wire outside the control panel and tools for installations.
Engineer's salary is USD 80/day, depending on how the engineer make you satisfied. The date he arrives and leaves shall be counted as paid day.
Q3. How long is your machine's warranty period?
Warranty period for the delivered equipment will be 12 months after completion of erection but not later than 18months after shipment. In case any item proves to be defective and the damage is confirmed by seller's technicians within this period, the seller will at their choice either send engineer to repair or supply a new one for replacement free of charge on the basis of CNF delivery.
The above item does not include the parts, which have regular spares or the parts damaged from normal wear, abnormal operation, improper maintenance and inadequate civil works. The seller is not liable for any production loss under any circumstances.
Q4. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our after sales specialist at any time. Engineers will help to take a solution video according your description.
Q5. How do you arrange packing for machine?
As per export standard, they will also be treated before delivery against damage and rusting.