China Product Manufacture of Mpcvd Diamond Making Machine

Min.Order: 1
Product origin: Jinan, Shandong, China
Infringement complaint: complaintComplaint
US$ 120000

Description
Jinan ACME MW1070 MPCVD Machine
VacuumVacuum measurementPiezoresistive gauge 0.1-100kpa Capacitance gauge 0-1000Pa
Operating pressure range4-28Kpa
Vacuum leakage rate≤ 5 * 10-9Pa.M3/S (He leak detection)
Pressure controlAuto-Control
Cavity materialAluminum alloy excitation chamber, quartz vacuum chamber
Observation windowTemperature measuring hole with diameter of 10mm and observation window of porous hole
Cooling modeCooling modeWater cooling+chamber air cooling
Sample table sizeMolybdenum stage Φ 70mm, uniform area Φ 50mm
Temperature measurementInfrared thermometer, range 300-1400 ºC
Cooling water flow>50L/min
Cooling water temperature20-22ºC
Cooling water interface1-inch outer wire interface
Operating systemOperating systemPLC control, 15 inch touch screen control
Process Menu10 process menus, 25 lines for each
Microwave and power supplyMicrowave frequency2.45±0.1GHz
Output power1.5-7.5Kw (equipped with 10kw domestic microwave power supply)
Input power electricity380 Ac/50Hz, three-phase five wire (3 * 10+2 * 6 power line),>15Kw
Microwave leakage rateMicrowave leakage rate 5cm away from the equipment ≤ 5Mw/cm2
Process gasFlowmeter and interfaceH2 (1000SCCM) CH4 (50SCCM) N2 (10SCCM) O2 (10SCCM) 1/4 "VCR female compressed air 8mm Pu tube quick plug
The flowmeter can change the type of gas used through software
Air supply pressure0.3-0.35MPa
Compressed air pressure0.5-0.6MPa
Vacuum pumpRotary vane vacuum pumpOil pump
Pumping speed4L/S
Power supplyAc 380V(±10%)
InterfaceAir extraction KF25, air exhaust KF25
Operating environmentAmbient temperature and humidityThe room temperature is lower than 26 ºC and the humidity is lower than 40%
Overall dimensions of equipmentSize1250(L)×800(W)×2100(H)mm
Equipment appearance  
Equipment acceptance conditions:1. Equipment installation: After the equipment installation is completed, Party A and Party B shall conduct on-site commissioning, and Party B's technicians shall conduct equipment operation, safety and maintenance training for the person in charge of Party A.
2. System test: The system can be started and operated normally, and the detached fireball is stable without jumping.
3. Microwave leakage: the microwave leakage is less than 5mW/cm2 (the output power of the microwave source is more than 80%, 10cm away from the equipment)