Full Automatic Roll Feeding Block Bottom Paper Bag Processing Machine /Equipment for Food

Min.Order: 1
Product origin: Wenzhou, Zhejiang, China
Infringement complaint: complaintComplaint
US$ 50000

Description
Product Description


The machine for reel original colored paper or drum paper printing, such as kraft paper, glossy paper, medical paper roll consists of a paper bag process by puncture, center glue, color code length, raw material into a tube, set off long retreat, bottom fold bottom, bottom glue. Pocket bottom forming, complete finished bag finishing a. The machine operation more convenient, more efficient, more stable is in the production of a variety of different paper bags, fenestration bread bags, leisure food bag, bag of bread, dried fruit bags and so on environmental paper bag paper bag machine equipment.

Schematic Diagram

 

 
Product Parameters

 

 

Parameter nameParameter value
Paper bag length140-390mm
Paper bag width70-250mm
Insert size20-120mm
Paper material thickness35-80g/m^2
Bag speed30-180pcs/min
Bag mouth height15/20mm
Working Air Current≥0.12m3/min,0.6-1.2MPa
Machine power3phase4wire380V 18kw
Total weight4500kg
Machine Dimesion9100x3000x2200mm
 
Application



 

Detailed Photos

 

 
Packaging & Shipping

 


 
Certifications

 

Hot Selling Machines

DCWZ-XB700/XB800
Fully Automatic Non Woven Bag Making Machine
DCZZ-A330/A400/A550
Automatic square bottom paper bag making machine
DCTY-1200
Computer Control High Speed Rotogravure Printing Machine
DCWZ-D500
Non Woven U-cut Bag Manufacturing Machine
DCZZ-C270/C330
V Bottom Paper Bag Machine
FAQ

Q1. How to install and operate the machine?

Due to the Global Epidemics we can not send the engineer , will provide the manual and installation video.

After the global epidemic end, The seller will send 1 engineer to install, test the production line and train customers' workers in buyers' factory. It will take 1 week for whole installation and training.

Q2. What should we charge for your engineer?

The buyer should cover engineers' salary, visa cost, round-trip air tickets, accommodations, transportation in buyers' country, food, medical care, safety cost, and related cost happens in buyers' country. Also, the buyer should prepare enough labor, electric wire outside the control panel and tools for installations.

Engineer's salary is 
USD 80/day, depending on how the engineer make you satisfied. The date he arrives and leaves shall be counted as paid day.

Q3. How long is your machine's warranty period?

Warranty period for the delivered equipment will be 12 months after completion of erection but not later than 18months after shipment. In case any item proves to be defective and the damage is confirmed by seller's technicians within this period, the seller will at their choice either send engineer to repair or supply a new one for replacement free of charge on the basis of CNF delivery.

The above item does not include the parts, which have regular spares or the parts damaged from normal wear, abnormal operation, improper maintenance and inadequate civil works. The seller is not liable for any production loss under any circumstances.

Q4. How do we solve the machine problem after your engineer leaving?

Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our after sales specialist at any time. Engineers will help to take a solution video according your description.

Q5. How do you arrange packing for machine?

As per export standard, they will also be treated before delivery against damage and rusting.




Product Tag:
Related categories:
Scroll to Top